Swipe or use the arrows to view product images.
New5-Stage RO Filtration Drinking Fountains Hot & Cold Direct Drinking Machine
| Price | $268.00 |
|---|---|
| Min Order | 100 pieces |
| Availability | In Stock |
| Shipping From | Zhejiang, China |
| Popularity | 306 people viewed |
Model NO.:
AFK-788
Application:
Hotel, Outdoor, Garage, Commercial, Household
Type:
Hot & Cold
Installation:
Stand
Housing Material:
Stainless steel
Warranty:
1 Year
Power Source:
Electric
Power (W):
1000
After-Sales Service Provided:
Free Spare Parts
Packing Size(mm):
460*460*1490
Voltage (V):
220
Load Type:
Other
Feature:
Touch Switch Interface
MOQ:
20PCS
Function:
Water Purify
Filters:
5-Stage RO System
Dimensions (L x W x H (Inches):
400*400*1450
Product Name:
Smart Water Dispenser
OEM:
Support
Heating Capacity:
20L/H 90
Trademark:
AOFUK
Transport Package:
Cartoon
Origin:
Zhejiang, China
Product Description
Model No. | AFK-788 |
Function | Hot |
Color | BlackWhite |
Heating power | 1000W |
Heating Capacity : | 85-95 20L/h |
Packaging Dimension : | 460*460*1490mm |
N.W/G.W | 35kgs/38kgs |
Packing | Standard export carton |
Materials : Body material :Durable stainless steel metal
Side plates : 0.5 mm high-quality galvanized sheet iron
Rated Voltage/Frequency: 220V~240V; 50/60Hz
Power Cord (Plug): European Type or Other Standard options available
Side plates : 0.5 mm high-quality galvanized sheet iron
Rated Voltage/Frequency: 220V~240V; 50/60Hz
Power Cord (Plug): European Type or Other Standard options available
WALL-MOUNTED PIPELINE VERTICAL WATER DISPENSER & RO WATER DISPENSER
DESKTOP WATER DISPENSER & TEA BAR MACHINE & WATER PURIFIER
Q1: What is the production time?
A1: Typically, it takes about 25-30 days after the deposit is received.Q2: Can I put my own Logo on the machine?
A2: Absolutely! We specialize in OEM orders. Logo, carton design, and color can all be customized to your preferences.
Q3:What are your payment terms?
A3:We usually accept T/T as the main payment method, but other options can also be negotiated.
Q4:What is the delivery time?
A4:Since it is an OEM order, it usually takes about 7-15 working days to produce the products.
Q5: What is the lead time for mass production?
A5: Honestly, it depends on the order quantity and your specific product requirements.
- Similar Products
$37.00
100 Pieces (MOQ)
Powerful Hot and Cold Water Dispenser with Compressor
Ningbo Dilamu Electric Appliance Co., Ltd.