Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

OEM Custom Auto Part Sheet Metal Fabrication Parts Metal Brackets

Price $9.90
Min Order 100 Pieces
Availability In Stock
Shipping From Jiangsu, China
Popularity 486 people viewed
Model NO.:
HY007
Standard:
GB, EN, China GB Code, ASME
Tolerance:
Customized
Surface Treatment:
Powder Coated, Passivating, Anodizing, Electroplat
Machining Method:
Forging, Casting, Broaching, Extrusion, CNC Stampi
Material:
Stainless Steel, Aluminium Profile, Aluminum Plate
Standard:
GB, En, China GB Code, JIS Code, ASME
Tolerance:
+/-0.10mm
Machining Method:
CNC Machining
Surface Treatment:
Powder Coated, Passivating, Anodizing, Electroplat
Material:
Stainless Steel, Aluminium Profile, Aluminum Plate
Drawing Format:
Step, STP, Gis, CAD, Pdf, Dwg, etc.
Process:
Sheet Cutting, Bending, Stamping, Welding, etc
Processing Time:
Leadtime of Mass Production:10-20days
Trademark:
honglin
Transport Package:
Clean Poly Bags First Plus Cartons, Then Put on PA
Specification:
customized as customer's prime requirement
Origin:
Jiangsu, China
Product Description

Item nameSheet Metal Parts
Materials availableSheet Metal Fabrication / CNC Machining / Metal cabinets&enclosure&box / Laser Cutting Service / Steel Bracket / Stamping Parts, etc.
DesignWe use the most advanced mould design software Auto CAD, Pro/E, Solidworks, UG (dwg, dxf, IGS, STP, X-T)
Production ShapeVarious shapes are available
Toleranceas per customers' requirement.
MaterialIron, Aluminum, Carbon Steel, Brass, Stainless steel etc.
Surface TreatmentAnodize, Chromate, Electrolytic Plating, Nickel Plating, Galvanize, Tempered, Paint, Powder Coating, Polish etc.
Industry Of  UseMachinery manufacturing, electronics, aviation, industrial equipment, electrical, architectural decoration, lighting, auto parts, transportation, medical, computer products, agricultural food and so on.
Sample Lead-timeWithin 1day  for samples available from our stock
About  1-2 weeks for custom samples
Mass Production Lead-time3-7 weeks after receiving deposit
Payment TermsEXW/FOB/CFR/CIF Qingdao or any other airport or seaport, China
Payment30% deposit, balance against B/L copy
Delivery Time25-60 days based on the different products
PackageCarton,Wooden Case or as Required
Service TypeOEM & ODM
InspectionIn-house or third party, all the products are strictly inspected by skilled QC
 





     This product is our company's custom stamping parts, using automatic feeding continuous stamping processing, through stamping, welding,tapping, chamfering, spray, packaging, OEM metal stamping products.

 
 
We are a professional metal processing factory, stamping parts are ours featured products, professional design and manufacture of high - quality stamping parts.

    Products are made of sheet metal, with advanced equipment and excellent team using solidworks, CAD and other professional production of sheet metal precision stamping products.
   

     Any OEM/ODM is acceptable! We have more than 20 years of professional experience, especially in sheet metal hardware products, metal stamping parts and CNC parts manufacturing, hardware accessories.

   Before mass production, we provide pre-production samples and sheet metal fine stamping products.


   All products are subject to customer's final confirmation.





 

 Linear Cutting Machine & Milling Machine

Shearing Machine


Laser Cutting


Punching Machine
Bending Machine & Welding Machine



Spray Equipment 


Q1. What kind of production service do you provide?

mould making, CNC machining, stamping, simple assembly and various metal surface treatment.

Q2. How about the lead time?
Mould : 3-5 weeks
Mass production : 2-3 weeks

Q3. How about your quality?
Our management and production executed strictly according to ISO9001 : 2015 quality System.
We will make the operation instruction once the sample is approval. 
 We will 100% inspect the products before shipment.
If there is quality problem, we will supply the replacement by our shipping cost.

Q4. How long should we take for a quotation?
After receiving detail information we will quote within 1 day.

Q5. What is your quotation element?
Drawing or Sample, Material, finish and Quantity.

Q6. What is your payment term?
Mould : 50% prepaid, 50% after the mould finish, balance after sample approval.
Goods : 30% prepaid, balance T/T before shipment.
 

 

  • Similar Products
Full Page Contact Supplier