Swipe or use the arrows to view product images.
OEM Custom High Precision CNC Machining Part Metal Electric Lathe Stamping Parts
| Price | $0.20 |
|---|---|
| Min Order | 100 Pieces |
| Availability | In Stock |
| Shipping From | Tianjin, China |
| Popularity | 482 people viewed |
Model NO.:
st-n89
Type:
Cold Stamping
Processing Type:
Deep Drawing
Material:
Stainless Steel
Mould:
Simple Single Process Dies
Surface Processing:
Oxidation
Fine Blanking:
Multi-Position
Process:
Forming Process
Industry:
Metal Stamping Parts
Tolerances:
0.01mm
Customized:
Customized
MOQ:
10
Surface Treatment:
Electroplating/Spraying/Polishing/Oxidation/Galvan
After-Sale Service:
24 Hours
Delivery:
Sea, Air, or Express
Quality:
Excellent
After Warranty Service:
Video Technical Support, Online Support
Transport Package:
Polybag Lnner+Export Carton Outer
Specification:
customized
Origin:
Hebei
Product Description
| 1. Raw Material | Copper, phosphor copper, Brass, Stainless steel, Aluminum, steel, spring steel, Nickel-Silver... and all different kinds of metal; |
| 2. Surface treatment | Gold / Silver /Tin / Nickel / Zinc / Chromium / Copper-plating / Laser etching/Screen printing/Phosphating (can pass salt spray testing with 160 hours)/Black coating / Painting/ Power coating /Electrophoresis / Passivating /Deburring / Polishing / Brush according to ROHS standard; |
| 3. Quotation | Please provide the Formal drawings (normally, with DWG/STP/PDF file ), and make notes with material/QTY/surface treatment and any other requirements, we will provide you the quotation sheet within 48-72 hours; |
| 4. Prototype & Mould | We make the prototypes or molds according to the drawings confirmed by both of us and the customers! The lead time depends on the structure and qty of parts, Normally, the lead time for prototypes is 3-15 days; the lead time for mold is 10-25 days; |
| 5. Production | We will provide samples according to the drawings to customers for approval. Then arrange the production and confirm the delivery date according to the Purchase Order; Normally, the lead time for production is 5-30 days, the structure of parts is different, and the lead time will be different. |
| 6. Package | Plastic bags; Preserving Box; Reel/tape package; Plastic tray; Wood box; Export carton and any other customized package according to the customers' requests. |
Please send us the drawings, quantity, weight and materials of the products.
Q: If we don't have drawings, can you draw them for me?
A: Yes, we can draw your samples and copy them.
Q: What kind of documents can you read?
Answer: PDF, IGS, DWG, step, etc...
Q: What is your packing method?
A: We usually pack the goods according to the customer's requirements. For reference: wrapping paper, cartons, wooden cases, pallets.
Q: When can I get the samples and your main orders?
A: For samples: 30-40 days after the start of mold making. For orders: 35-40 days, the exact time depends on the product.
Q: What are your terms of payment?
A: Order: 50% deposit, 50% payment before shipment.
Q: Where is your company located? Can we visit it?
We are in Tianjin, China. You are welcome to visit us at any time
- Similar Products
$3.99
1 Piece (MOQ)
Stainless Steel Precision Metal Stamping
Shenzhen Runze Hardware Technology Co., Ltd.
$0.30
100 Pieces (MOQ)
Durable Metal Stamping Parts for Industrial OEM Solutions
Beijing Oriens Technology Co., Ltd.