Swipe or use the arrows to view product images.
OEM Investment Casting Spare Part for Truck
| Price | $30.00 |
|---|---|
| Min Order | 400 Pieces |
| Availability | In Stock |
| Shipping From | Zhejiang, China |
| Popularity | 517 people viewed |
Model NO.:
None
Casting Method:
Thermal Gravity Casting
Process:
Investment Casting
Molding Technics:
Pressure Casting
Application:
Machinery Parts
Material:
Cast Steel
Surface Preparation:
Polishing
Surface Roughness:
Ra3.2
Machining Tolerance:
+/-0.10mm
Standard:
ASTM
Certification:
CE, RoHS, ISO 9001:2000
Factory Address:
Ningbo
ISO 9001:
Yes
Machining Service:
Yes
Finished:
OEM
Trademark:
None
Transport Package:
Anti-Corrision
Specification:
Customized
Origin:
China
HS Code:
7325101000
Product Description
Products Description
Investment casting is one of the oldest manufacturing processes which are also referred to as lost-wax methods. It produces precision parts in metal. This process simply involves making a wax pattern which is fundamentally a copy of the anticipated part in iron, steel, copper, and aluminum.
In this process of Investment casting, the pattern is covered in a ceramic material and then removed when the heat is applied. Just like other casting processes, the mold is filled with molten steel and when the mold is broken away from the solid steel, it produces the casting parts.
OEM Investment Casting Truck Spare Part
Material | Carbon steel, Alloy steel, Stainless steel, Aluminium, Copper | ||
Process | Lost wax casting + CNC machining | ||
Casting tolerance | +/- 0.02 mm | ||
Casting roughness | Ra1.6-3.2 | ||
Casting weight range | 0.005-50kg | ||
Surface treatment | Zinc plating, Polishing, Anodizing, Painting, Nickel plating | ||
Service | OEM | ||
Quality Control | 100% inspection | ||
Application | Industrial, commercial, Household, Automotive parts | ||
Quality Control
1) Checking the raw material after they reach our factory------- Incoming quality control ( IQC)
2) Checking the details before the production line operated
3) Have a full inspection and routing inspection during mass production---In-process quality control(IPQC)
4) Checking the goods after they are finished---- Final quality control(FQC)
5) Checking the goods after they are finished-----Outgoing quality control(OQC)
FAQ
Q: Are you a trading company or manufacturer?
A: We are a factory with more than 20 years' experience.
Q: How long for delivery?
A: Generally it is 15-30days as we are a customized service we confirm with customers when place order.
Q: What is the MOQ?
A: It depends on what you are buying. Normally, our minimum order is one 20' full container and an LCL container (less than a
container load) can be acceptable.
Q: Can you customize my products?
A: Yes, we can customize products with your design drawings like DWG, DXF, DXW, IGES, STEP, PDF, etc.
Q: What is your terms of payment?
A: 30% T/T in advance, balance before shipment, or as per discussion.
Q: What about your quality control?
A: * . Checking the raw material after they reach our factory-----Incoming quality control(IQC)
* . Checking the details before the production line operated
* . Have a full inspection and routing inspection during mass production----In-process quality control(IPQC)
* . Checking the goods after they are finished----Final quality control(FQC)
* . Checking the goods after they are finished----Outgoing quality control(QC)
* . 100% inspection and delivery before shipment
- Similar Products