Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Omts 250 151b3038 Hydraulic Orbit Motor of Danfoss for Construction Machinery

Price $700.00
Min Order 1 Piece
Availability In Stock
Shipping From Zhejiang, China
Popularity 262 people viewed
Model NO.:
OMTS 250 151B3038
After-sales Service:
Tech Service and Parts Supporting
Warranty:
1 Year
Structure:
Radial Plunger Pump
Cylinder Number:
Single Cylinder
Drive Mode:
Hydraulic Driven Reciprocating Pump
Pump Shaft Position:
Vertical
Type:
Radial
Power:
Hydraulic
Straight Shaft Swashplate Piston Type:
Pressureoil
Radial Plunger Pump Type:
Valve with Flow
Material:
Carbon Steel
Usage:
Oil
Apply to:
Excavator
Trademark:
PX
Transport Package:
Box or Customer Requirements
Specification:
OMTS 250
Origin:
China
HS Code:
8413606090
Product Description
Our Advantage
1. There are lots of available hydraulic pump in stock.
2. We are professional supplier of hydraulics.
3. Our factory has more than 10 years exprience in hydraulic industry.
4. We can provide fast logistics services

Related Products


Applied for





Packaging & Shipping




FAQ

Payment term:

1. T/T: 30% deposit by T/T, 70% balance by T/T before shipment

2. L/C at sight

Trade term: EXW or FOB Ningbo/Shanghai

Packing details:

Eternal Brand, Neutral or Customer's requires packing 

Neutral carton or same as the Customer's requires, export standard carton

All cartons should be packed into the pallets more carefully.

All of the productions are inspected carefully one by one by QC before delivery.

Delivery time:

We have huge quantity of inventory for complete pumps, motor and some pare pats, 
so the leading time is within 3days if have in stock. 
If haven't, within 5days if the quantity is less than 50pcs. 
It depends on the quantity ordered.

Min. Order:
If the model is in common or the production are in our stock warehouse, 
No MOQ for stocking production.Larger quantity, price will be more favorable.

Deliever Way:

By courier, like the DHL, UPS, Fedex,etc. It's door to door or barn to the door,
usually 5-7 days to arrive.

By air to air port, usually 3-5 days to arrive

By sea to sea port, usually 20-30 days to arrive.

If your deliever time is very urgent, we suggest that you choose by courier or air.

If not, it's very cheap to by sea.

CONTACT US



  • Similar Products
Full Page Contact Supplier