Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Outdoor Luxury Double Top Aluminum Frame Pole Garden Patio Umbrella

Price $20.00
Min Order 10 Pieces
Availability In Stock
Shipping From Shandong, China
Popularity 463 people viewed
Model NO.:
U-1
Top Style:
Ridge Tent
Capacity:
6-10
Material:
PVC,PU,Polyester Oxford 300d, 420d, 600d, 800d
Usage:
Party, Camping Tent, Traditional, Beach Tent, Advertising Tent, Relief, Wedding,Ect
Style:
Customized
Pole Material:
Steel
Structure:
Customized
Color:
Customized
Season:
All Seasons
Waterproof:
Waterproof
Customized:
Customized
Frame Weight:
13kg to 20kg
Logo:
Custom Logo Printed
Accessories:
Sidewalls, Walls, Window, Windproof Bag, Portable
Feature:
100% Waterproof Anti-UV Heavy Duty & Durable Fold
Frame Material:
Power Coating Steel Tubes
Trademark:
PIXINGKE
Transport Package:
1 Set/Carton
Specification:
2x2m,2x3m, 2x4m, 3x3m, 3x4.5m, 3x6m, 2.5x2.5m, 2.
Origin:
China
HS Code:
630622
Product Description
Product Description
 
 
 
 
Specification
Size:
2.7m*8ribs
Function:
Waterproof, Sun-UV Protection
Shaft:
wooden,metal or aluminum
Ribs:
metal or fiberglass
Fabric:
200g polyester
Open:
manual open,with Tilt,crank
Top&Tips:
Plastic/metal
Imprint:
Silk screen printing, heat transfer printing, offset printing, digital printing etc
Packing:
Self-carton, 1pc/ctn
Customized:
OEM & ODM are welcomed
Sample time:
About 5-7 working days
Production Time:
About 20-60 days after order confirmed
 
 
   
 
 

 
00:01
 
0
Why Choose Us

1.Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
However customer has to pay for the product cost and shippingcost.

2.What about the delivery time?
A: Sample needs 5-10 days, mass production time needs 15-45 days for orders.

3.How do you sove the complaint from customer?
A: Find the key point of complaint firstly,take steps to solve it.
If the mistake belong us,we will bear all losses.

Production Lead Time:
1.High Season(September to April): 35-60 days
2.Low Season( May to August) :around 15-35 days
3.We will come up with a detailed production schedule for
each order and this schedule will be a platform for onward
communication between customers and us."

Production Capacity:
1.5 production lines
2.Daily output of 200pcs furniture
3.Monthly output of 30 containers.
4. Yearly output of 80000pcs furniture and 400 containers

 
  • Similar Products
Full Page Contact Supplier