Swipe or use the arrows to view product images.
PVD Drain Water Drainage Board Sheet Production Line Plastic Extrusion Machine
| Price | $39000.00 |
|---|---|
| Min Order | 1 Set |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 538 people viewed |
Model NO.:
SJ90/30
After-sales Service:
24 Hours Online
Warranty:
1 Year
Type:
Profile Extruder
Plastic Processed:
PE
Product Type:
Extrusion Molding Machine
Feeding Mode:
One Feed
Assembly Structure:
Integral Type Extruder
Screw:
Single-Screw
Engagement System:
Full Intermeshing
Screw Channel Structure:
Deep Screw
Exhaust:
Exhaust
Automation:
Automatic
Computerized:
Computerized
Screw Diameter:
90mm
Screw Length-Diameter Ratio:
30:1
Output:
180-200kg
Heat Power:
25kw
Motor Power:
55kw
Motor Speed:
1500rpm
Product Width:
100mm
Product Thickness:
3-5mm
Frequency:
Inovance
PLC Control Screen:
Siemens
Trademark:
Zhongrui
Transport Package:
Conventional Packing
Specification:
100mm
Origin:
Qingdao China
Product Description
PVD Plastic water drainage board sheet making machine
No. | Iterm Name | Quantity | Unit |
1 | SJ90/30 Single screw extruder | 1 | Set |
2 | Automatic feeding and drying system | 1 | Set |
3 | Hydraulic screen changer | 1 | Set |
4 | Mold | 1 | Set |
5 | water cooling tank | 1 | Set |
6 | Twin roller hauling-off unit | 1 | Set |
7 | Cladding pressing and Welding forming device | 1 | Set |
8 | Double winder unint | 1 | Set |
| 9 | PLC electrical control system | 1 | Set |
10 | Mixing machine for colour | 1 | Set |
SJ90/30 Single screw extruder
Automatic feeding and drying system
Mold
water cooling tank
Twin roller hauling-off unit
Cladding pressing and Welding forming device
Double winder unint
PLC electrical control system
Product Description
Application:
FAQ
Q1.How to pay to you?
A:1)30% of total amount paid by TT as advance, then the seller start production
2)after the machine is finished ,buyer come to test the machine in seller's factory ,
and then pay the 70% balance by TT or irrevocable L/C at sight . Then seller ship the machine.
Q2.How long is the delivery time?
A: For standard machines, it would be 30 days; For non-standard machines and customized machines according
to client s specific requirements, it would be 45 days.
Q3.Do you arrange shipment for the machines?
A:Yes,for FOB or CIF price, we will arrange shipment for you.
Q4.How about the documents after shipment?
After shipment, we ll send all original documents to you by DHL, including Packing List,
Commercial Invoice, B/L, and other certificates as required by clients.
Q5.What's your after-sales service ?
(1)The supplier provides service manual and maintenance instruction of main electric appliances, limb, usage manual of equipment. We also supply water, electricity, gas of equipment and installation drawing.
(2)The supplier is responsible for installation, debugging and training, but the air tickets, insurance, eating, housing and every day 100 USD for each engineer will be born by the buyers. We will realize guarantee of repair; replacement and refund of substandard products within one year after the machine leaves factory. And half a year for electric parts. Fittings of the machine will be supplied at preferential price after one year.
Q1.How to pay to you?
A:1)30% of total amount paid by TT as advance, then the seller start production
2)after the machine is finished ,buyer come to test the machine in seller's factory ,
and then pay the 70% balance by TT or irrevocable L/C at sight . Then seller ship the machine.
Q2.How long is the delivery time?
A: For standard machines, it would be 30 days; For non-standard machines and customized machines according
to client s specific requirements, it would be 45 days.
Q3.Do you arrange shipment for the machines?
A:Yes,for FOB or CIF price, we will arrange shipment for you.
Q4.How about the documents after shipment?
After shipment, we ll send all original documents to you by DHL, including Packing List,
Commercial Invoice, B/L, and other certificates as required by clients.
Q5.What's your after-sales service ?
(1)The supplier provides service manual and maintenance instruction of main electric appliances, limb, usage manual of equipment. We also supply water, electricity, gas of equipment and installation drawing.
(2)The supplier is responsible for installation, debugging and training, but the air tickets, insurance, eating, housing and every day 100 USD for each engineer will be born by the buyers. We will realize guarantee of repair; replacement and refund of substandard products within one year after the machine leaves factory. And half a year for electric parts. Fittings of the machine will be supplied at preferential price after one year.
- Similar Products
$180000.00
1 Piece (MOQ)
ABC Blowing Film Machine for DHL Courier Bags
Ruian Zhechuang International Trade Co., Ltd.