Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Portal Frame Steel Structure Building Construction for Prefabricated Commercial Warehouse Industrial Fabricated Workshop Prefab Office Farm Metal Shed

Price $40.00
Min Order 300 Square Meters
Availability In Stock
Shipping From Guangdong, China
Popularity 405 people viewed
Connection Form:
Bolt Connection
Feature:
Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable
Install:
Online Guidance
Application:
Hotel, Apartment, School, Dormitory, Canteen, Hosp
Grade:
Q235/Q235B/Q345/Q345b
Surface Treatment:
Hop DIP Galvanized or Painted
Steel Structure Building Size:
Customized
Wall & Roof:
Corrugated Steel Sheet or Sandwich Panel
Window:
Aluminium Alloy Window
Door:
Steel Door, Sliding Door,Rolling Door
Guarantee:
1 Year
Keyword:
Steel Metal Frame Structure
Product Name:
Steel Structure Building
Trademark:
YAJ BUILDING
Specification:
Customized
Origin:
China
Product Description
                                                                 FOSHAN YAJ BUILDING CO., LTD
Specializes in different type container house, steel structure building, prefabricated house, sandwich panels.
With professional experiences, advanced technical knowledge and strict quality controls, YAJ building is in the
forefront as one of the most trusted firms in the industry, provide one-stop service from design, manufacturing,
logistics, customs clearance, to installation supervision for our products.
Main PartsItem NameSpecification
Main Steel FrameSteel ColumnQ235B,Q345B H beam ,Steel pipe
SteelBeamQ235B,Q345B H beam ,Steel pipe
BraceQ235B,Q345B Steel rod,Steel pipe,Angle Steel
Roof PurlinQ235,C section steel or Z shape steel
Wall PurlinQ235,C section steel or Z shape steel
RoofRoofSingle painted corrugate steel sheet, Or Sandwich panel with EPS,Rock wool,PU,Glass Wool insulation.
WallWallSingle painted corrugate steel sheet, Sandwich panel with EPS,Rock woo,PU,Glass Wool insulation.
AccessoriesBoltsOrdinary,High Strength
GutterGalvanize Steel Plate, Stainless Steel,PVC
WindowsAluminum alloy-glass, Aluminum alloy-shutter,PVC window
DoorsSliding or Rolling door,steel door
DownpipePVC pipe,Color steel pipe
Edge CoverMade of color steel sheet
VentilatorStainless steel ventilation ball, or ridge ventilation
CraneCrane in 5 tons to 20 tons

1.Steel structure knock down system, weld and cut in the factory, only bolt connection on site.
2.Door and window panels are packed with foam and bubble paper.
3.Hardware is put in wooden case or carton, or plastic bag for each unit.
4.YAJ professional packing and transportable, will help customers reduce transportation and handing costs,
and reduce the goods damages in the transit.
   Foshan YAJ Building Co., Ltd is located in Foshan City, Guangdong province, China, with professional
manufacture and export experience over 16 years.

  Specializes in different type container house, steel structure building, prefabricated house, sandwich panels.
With professional experiences, advanced technical knowledge and strict quality controls, YAJ building is in the
forefront as one of the most trusted firms in the industry, provide one-stop service from design, manufacturing,
logistics, customs clearance, to installation supervision for our products.
Q1: May I visit your factory?
A1: Yes, of course. Foshan YAJ BUILDING CO., Ltd is located in Foshan, Guangdong, China.

Q2: What is your terms of payment?
A2: 30-50% TT for deposit, balance before the shipping or 100% Irrevocable L/C at sight.

Q3: Can you supply the sample?
A3: Yes, we can supply the sample of sandwich panel, house parts. Also all the sample express cost will be
refunded after you place the order.

Q4: Is this installation easy?
A4: Yes, our prefab house is easy to install and don't need to be weld and processed again. We will offer you
complete installation drawing and online technical support.

Q5: Can you customized it for us?
A5: We have professional engineer team who will make out a complete solutions according to your job site
dimensions and situations.

Q6: What'the delivery time?
A6: Generally, if quantity is less than 3*40 HQ.
1.Portable cabin, will take 30 days.
2.Detachable container house / Flat pack container house, will take 15 days.
3.Prefab worker accommodation, will take 25 days.
4.Steel structure warehouse / workshop, will take 35 days.
5.Sandwich panel, will take 7 days.

Q7: How do you guarantee the quality of the products?
A7: Quality first, 100% strict quality checking before delivery.
  • Similar Products
Full Page Contact Supplier