Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Powder Coating Booth/Oven/Chamber Curing Booth/Oven/Room Electrostatic Coating Booth

Price $26000.00
Min Order 1 Set
Availability In Stock
Shipping From Hebei, China
Popularity 541 people viewed
Model NO.:
ZYS60604
Application:
Hardware Spraying Equipment
Certification:
CE, ISO
Warranty:
2 Year
Booth:
Tunnel Type, Walk-in Type, Mono-Cyclone Type
Oven:
Bridge Type, Tunnel Type, Box Type
Gun:
Gema, Wagoner, Zhyao
Heating Method:
Gas, Electricit, Diesel
Type:
Electrostatic Spraying Equipment
Coating:
Powder
Method Type:
Automatic
Condition:
New
After-sales Service:
Free Spare Parts, Field Installation, etc
Trademark:
Zhyao
Transport Package:
Wooden Case
Specification:
Customized
Origin:
China
HS Code:
8424899990
Product Description
The process of Automatic powder coating line
No.Process NameProcess ParameterModeRemarks
TemperatureTime
1LoadingRT   
2Pre treatment35-50ºC15-20 minAutomaticAdjustable
3Drying Oven 100-120ºC15-20 minAutomaticAdjustable
4Cooling RT5-10 min  
5Powder coatingRT3-5minAutomatic and ManualAdjustable
6Curing200-220ºC30-35 minAutomatic Adjustable
7CoolingRT10-15 min  
8UnloadingRT   


FAQ

1.Are you a trader or a factory?

We are manufacturer and exporter.
Our own factory was found in 1995,Our export office was established in 2014.

2.What should I provide if interested in your powder coating equipment ?

A.The material/size/weight of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)
C.What heating power do you prefer: electric, gas, diesel or coal
D.The size of your factory(length, width and height)

3.How to ensure the quality of the equipment?

A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee,  reasonably determines and divides the stages of design,  production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department. 
C,We manning quality inspectors specially to control the processing quality of product strictly.

4.How to install equipment after purchasing your equipment?

A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment. 
C,After the debugging, will provide complete training and track customer device usage.

5.How is your company's after-sales service done?

A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.


  • Similar Products
Full Page Contact Supplier