Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Premium Seamless Steel Pipe for Automotive Component Manufacturing

Price $950.00
Min Order 1 Ton
Availability In Stock
Shipping From Fujian, China
Popularity 297 people viewed
Model NO.:
OD 15-80mm wt 2-20
After-sales Service:
Free
Warranty:
Free
Type:
Seamless
Technique:
Cold Drawn
Material:
Carbon Steel
Surface Treatment:
Oiled
Usage:
Boiler Pipe, Hydraulic/Automobile Pipe, Machinery Industry, Special Purpose
Section Shape:
Round
IATF16949:
Od15-70
Deform:
Cold Drawn/Rolling
Thickness:
1-20mm
Customized:
Yes
Trademark:
bluesky pipe
Transport Package:
Bund
Origin:
China
HS Code:
7304319000
Product Description


 

      
steel grade+C(BK)+LC(BKW)+SR(BKS)+A(GBK)+N(NBK)
 Rm(Mpa)A(%)Rm(Mpa)A(%)Rm(Mpa)Reh(Mpa)A(%)Rm(Mpa)A(%)Rm(Mpa)Reh(Mpa)A(%)
104308380104003001633524320~45021527
20550552085203751239021440~57025521
3559055507---51017≥46028021
4564546306---5901454034018
25Mn650658085804501049018---
Q355B640458075804501045022490~63035522
Q420B750462086905901252022550~70042522
25CrMo72046706--------
42CrMo72046706--------
StandardsGB/T8162,GB/T8163,GB/T3094,GB/T3639,JIS 3445,JIS3441,ASTM A519,AMS-T-6736,EN 10305,BS 6323,DIN 2391
 
Steel Grade10#,20#,35#,45#,Q235,Q355, T35(E235) ,ST5(E255),ST52(E355),37Mn5,   SAE1010,SAE1020,SAE1035,SAE1045,
SAE4130,SAE4140,20Cr,40Cr,
20CrMo,20CrMnTi  etc.
Material10#-45#, 16Mn, A53-A369, Cr-Mo alloy, Q195-Q345, ST35-ST52, 10#, 20#, 45#,  16Mn, A213, A315, 30CrMo, Q195, Q215, Q235, Q345, ST35, St37, St45, St52
SurfaceBlack/ Bright
StandardDIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094- 2000, GB/T 8163-1999, JIS G3101
SizeOD 15mm-70mm
Thickness 1-12mm
ProcessingCold rolled/ Cold drawn
1. BK (+C)  No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass ( cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled  atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the  upper transformation point in a controlled atmosphere.
PackingWoven bag/ Wooden or crate carton/ Bundle Packing/ Plain end or vanished as per  customer's request.
Delivery timeNormally 20-30 working days
  • Similar Products
Full Page Contact Supplier