Swipe or use the arrows to view product images.
Q345 Cuplock Scaffolding System for Reliable Construction Support
| Price | $20.00 |
|---|---|
| Min Order | 500 Pieces |
| Availability | In Stock |
| Shipping From | Jiangsu, China |
| Popularity | 366 people viewed |
Model NO.:
Standard
After-sales Service:
Customer Service
Material:
Steel
Type:
Mobile
Structural Style:
Multi-Pole Scaffolding
Framework:
Combined Scaffolding
Supporting Mode:
Wall Hanging Scaffolding
Lapping Form:
Full Scaffolding
Erection Position:
Internal Scaffolding
Move Method:
Attached Lifting Scaffolding
Scaffolding Part Type:
System
Construction Properties:
Installation Scaffold
Certificate:
Ce, SGS, TUV
Factory Certificate:
ISO9001
Finished:
Hot DIP Galvanized
Steel Class:
Q345, Q235
Trademark:
METEC
Transport Package:
Package/ Steel Pallets
Specification:
OD48.3 X 3.2mm
Origin:
Wuxi, China
HS Code:
73084000
Product Description
Cuplock scaffolding
Features:
1. Standard: Made of 48mm O. D. X 3.2mm thickness high grade steel tube, 1 cup 0.5meter, Length: 3000, 2500, 2000, 1500, 1000, 500mm etc.
Available, and can be to ordered by you,
2. Ledger: Made of 48mm O. D. X 3.2mm thickness high grade steel tube, length800mm/ 1500mm, length can be ordered.
3. Cup: Made from cast-steel or pressed steel
4. Ledger connection-peg: Made from cast-steel,
5. Base screw jack: Length 600mmx3.5mm thickness strength tube, length to be order, solid tube available.
6. U head screw jack: Length600mmx3.5mmthickness strength tube with U head plate, length can to be order, solid tube available.
7. Surface: Painted/cold (hot) dipped galvanized or to be order
8. Also can manufacture it as your requirement
Standard/Vertical
| CV910 | VERTICAL 9'10" (3M) - 6 CUPS | HDG | |
| CV82 | VERTICAL 8'2" (2.5M) - 5 CUPS | HDG | |
| CV66 | VERTICAL 6'6" (2M) - 4 CUPS | HDG | |
| CV411 | VERTICAL 4'11" (1.5M) - 3 CUPS | HDG | |
| CV33 | VERTICAL 3'3" (1M) - 2 CUPS | HDG | |
| CV10 | VERTICAL 1'7" (0.5M) - 1 CUP | HDG |
Horizontal Runners
| CH100 | HORIZONTAL 10' (3048MM) | HDG |
| CH90 | HORIZONTAL 9' (2743.2MM) | HDG |
| CH82 | HORIZONTAL 8'2" (2500MM) | HDG |
| CH80 | HORIZONTAL 8' (2438.4MM) | HDG |
| CH70 | HORIZONTAL 7' (2133.6MM) | HDG |
| CH60 | HORIZONTAL 6' (1828.8MM) | HDG |
| CH511 | HORIZONTAL 5'11" (1800MM) | HDG |
| CH50 | HORIZONTAL 5' (1524MM) | HDG |
| CH411 | HORIZONTAL 4'11" (1500.2MM) | HDG |
| CH41 | HORIZONTAL 4'1" (1250MM) | HDG |
| CH40 | HORIZONTAL 4' (1219.2MM) | HDG |
| CH36 | HORIZONTAL 3'6" (1066.8MM) | HDG |
| CH30 | HORIZONTAL 3' (914.4MM) | HDG |
| CH27 | HORIZONTAL 2'7" (788.19MM) | HDG |
| CH211 | HORIZONTAL 2'11" (900MM) | HDG |
| CH110 | HORIZONTAL 1'10" (559.59MM) | HDG |
Swival clamp brace
| CCB100 | CLAMP BRACE 10' BAY (3048MM) | HDG |
| CCB90 | CLAMP BRACE 9' BAY (2743.2MM) | HDG |
| CCB86 | CLAMP BRACE 8'6" BAY | HDG |
| CCB82 | CLAMP BRACE 8'2" BAY | HDG |
| CCB80 | CLAMP BRACE 8' BAY | HDG |
| CCB70 | CLAMP BRACE 7' BAY | HDG |
| CCB60 | CLAMP BRACE 6' BAY | HDG |
| CCB50 | CLAMP BRACE 5' BAY | HDG |
| CCB30 | CLAMP BRACE 3' BAY | HDG |
Face brace
| CFB100 | FACE BRACE 10' (143.53" C-C) | HDG |
| CFB90 | FACE BRACE 9' (133.66" C-C) | HDG |
| CFB82 | FACE BRACE 8'2" (126.05" C-C) | HDG |
| CFB80 | FACE BRACE 8' (124.16" C-C) | HDG |
| CFB70 | FACE BRACE 7' (115.14" C-C) | HDG |
| CFB511 | FACE BRACE 5'11" (105.93" C-C) | HDG |
| Company | Wuxi Metec Metal Co., Ltd. | ||||
| Product | Ringlock system, cuplock system, frame system,work platform ,props, steel plank, scaffolding accessaries,tube and clamps | ||||
| Certification | CE/ TUV / ISO9001-2000 / SGS, | ||||
| Service | OEM / ODM | ||||
| Principle | Reliable quality, strict management , superb technology , reasonable price , excellent service | ||||
| Website | http://metecmetal.en.made-in-china.com | ||||
Our standards and ledgers of scaffolding products are fully welded by machine, resulting in clear, flat and seamless products. Our welders are well trained by AWS D1.1 to standardize Butt Joint welding, Semi-Auto Fillet Welding and Auto Fillet Welding.
We are one of only a few companies that offer scaffolding products to be able to work under extreme weather condition, such as up to -40 dig encountered in Canada that our material of tubes are booked specially from steel factory.
| More than 10 years 'exportation experience |
| 30,000 tons annual capacity |
| With ISO9001-2000 quality management system |
| TUV/GS, CE Certificate |
We are committed to the establishment of and overseas customers and maintain long-term business relationship. We fully understand each customer .There are different requirements for specific products. So from the early we will set up a professional knowledge and skills of the sales team.
Q1: Are you a factory or trading company?
A: We are the manufacturer of ringlock & cuplock scaffoldings for more than 15 years.
Q2: Where is the loading port?
A: Shanghai port
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one container is preferred.
Q4: What certificates do you have?
A: We have ISO 9001, ISO 14001, CE, SGS, and TUV certification.
Q5: Can I get some samples?
A: Yes, Sample is free, but usually the customer will pay for the shipping cost.
Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.
Q7: How long is the production cycle after ordering?
A: General it is about 20-30 days.
Q8: What is the payment methods?
A: T/T payment is preferred and other payment terms is accepted.
- Similar Products
$4.00
1000 Pieces (MOQ)
90DIN Anchor Wing Nut for Concrete Slab Formwork Tie Rod Rebar
Rizhao Weiye Tools Co., Ltd.
$30.00
500 Pieces (MOQ)
Marco De Andamios
Hebei Zhong Jiao Jian Gong Construction Instrument Manufacturing Co., Ltd.