Swipe or use the arrows to view product images.
SA266 Metal Forgings Steel Ring Normalized + Tempering Quenching and Tempering Heat Treatment
| Price | $10000.00 |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Jiangsu, China |
| Popularity | 457 people viewed |
Model NO.:
SA266
Processing Object:
Metal
Molding Style:
Forging
Molding Technics:
Pressure Casting
Application:
Hardware
Material:
Steel
Heat Treatment:
Quenching
Surface Treatment:
Hot Galvanized
Forging Tolerance:
+/-0.5mm
Standard:
AISI
Certification:
CE, ISO 9001:2000
Manufacture:
According to Drawings
Trademark:
LJ
Transport Package:
Standard Export Packing
Origin:
Jiangsu
Product Description
Material Standard | GB, EN, DIN, ASTM, GOST, JIS, ISO | ||
Material Processing | Forging, Casting, Welding | ||
Heat Treatment | Annealing, Normalizing, Q&T, Induction Hardening | ||
Machining Tolerance | Max. 0.01mm | ||
Machining Roughness | Max. Ra 0.4 | ||
Module of Gear | 8-60 | ||
Accuracy of Teeth | Max. ISO Grade 5 | ||
Weight/Unit | 100kgs - 60 000kgs | ||
Application | Mining, Cement, Construction, Chemical, Oil Drilling, Steel Mill, Sugar Mill and Power Plant | ||
Certification | ISO 9001 | ||
OEM AND ODM SERVICE ARE OFFERED | |||
Strictly quality inspection system can produce high quality products.
For each order,we can provide report for material chemical testing,UT testing, hardness testing ,mechanical property testing, size inspection,etc.
In order to avoid the finish products rusted and damaged during the transportation ,we will design the right packing according to the shape,size and usage of the products.
Q: Are you trading company or manufacturer ?
A: We are factory and trading company
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
If you have another question, pls feel free to contact us as below:
- Similar Products
$500.00
1 Piece (MOQ)
Wind Tower Flange, Wind Turbine Tower Flange (G003)
Anhui TongSheng Heavy Equipment Co.,Ltd