Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Sb 4", 6", 8" Hole Digger / Ground Drill / Earth Auger

Price $43.00
Min Order 10 Pieces
Availability In Stock
Shipping From Zhejiang, China
Popularity 518 people viewed
Model NO.:
10"
Feature:
2-Stroke
Bit Diameter(mm):
250
Style:
Front - Earth Auger
Power Source:
Petrol / Gas
Colour:
Customized
Condition:
Screw
Packing:
Wooden Box
Lead Time:
35-40 Days for Bulk Order
Trademark:
HY
Transport Package:
Export Neutral Packing
Specification:
620*400*300mm 800*120*120mm
Origin:
Ningbo
HS Code:
84314320
Product Description
Sb 4", 6", 8" Hole Digger / Ground Drill / Earth Auger

Material: Steel
Surface: Painting, color as order.
Auger diameter OD: 15 inch (380mm)
Lead: Double
Pipe diameter: 63.6mm
Pipe length: 995mm
Blade thickness: 6mm
Pitch: 350mm
Blade length: 700mm
Colour: Black or red(as request)


We also can work as customer's drawing.

Ningbo huiyun Machinery co.,ltd is a professional auger attachment manufacturer.Focus on auger drive, earth auger and auger parts.With about 10years development, the company have workshops as casting, forging, machining, wleding, packing, as well as inspection lab. All the machine and process keep the qualify products and make sure satisfactory to our customers.The company have take part in the Exhibition of Bauma Shanghai 2010 ,2012,2014,.....The company export products to USA,Canada ,Austulia ,Russia and so on.

FAQ:

1.Are you a manufacturer or a trading company?
We are a 2000-square-meter factory located in zhejiang, China.

2.Can I get a quote without drawings?
Sure, we appreciate to receive your samples, pictures or drafts with detailed dimensions for accurate quotation.

3.Will my drawings be divulged if you benefit?
No, we pay much attention to protect our customers' privacy of drawings, signing NDA is also accepted if need.

4.Can you provide samples before mass production?
Sure, sample fee is needed, will be returned when mass production if possible.

5.How about the lead time?
Generally, 2-3 weeks for samples, 4-5 weeks for mass production.
  • Similar Products
Full Page Contact Supplier