$2000.00
20 Tons (MOQ)
Facade Scaffolding (FAS) with Top Quatily
Changzhou Yueyang Machinery Co., Ltd.
Swipe or use the arrows to view product images.
Scaffolding System, Steel Shoring Prop for Construction
| Price | $10.00 |
|---|---|
| Min Order | 1000 Pieces |
| Availability | In Stock |
| Shipping From | Tianjin, China |
| Popularity | 350 people viewed |
Model NO.:
TYT
Material:
Steel
Type:
Fixed
Structural Style:
Multi-Pole Scaffolding
Framework:
Combined Scaffolding
Supporting Mode:
Projecting Scaffolding
Lapping Form:
Single Row Scaffolding
Erection Position:
External Scaffolding
Move Method:
Attached Lifting Scaffolding
Scaffolding Part Type:
Scaffolding Props
Construction Properties:
Building Scaffold
Grade:
Q235, Q345
Diameter:
40/48/56/60mm
Thickness:
1.5-4.0mm
Weight Tolerance:
+/-5%
Surface:
Powder Coating or Galvanized
MOQ:
1000 PCS
Delivery Time:
25-40 Days
Payment Term:
Tt or LC
Packing:
in Bundles
Certificates:
SGS, ISO9001
OEM Service:
Available
Head:
Plain, U Head or Flower Plate
Using Life:
8-12 Years
Loading:
by 20FT or 40FT Container
Pins:
as Requirements
Trademark:
TYT(tianyingtai)
Transport Package:
Export in Bundle
Specification:
Regular or as customized
Origin:
China
HS Code:
73084000
Product Description
Scaffolding System, Steel Shoring Prop for Construction
1.Production Description
dfadf
2.Detailed Images
3.Company Introduction
4.Factory and Processing workshop
5.Laboratory/Test Centre
In order to 100% meet customers' requests, we establish our own test centre. In the whole Tianjin City, few factories have their own laboratory.
6.Packing and Delivery
7.Related Products
We also have our own steel pipe factory which is even long running than the scaffolding factory.
1.Production Description
| Product name | Scaffolding System, Steel Shoring Prop for Construction |
| Adjustable length | As customers' requests |
| Surface treatment | Painted, electro-galvanized, hot dipped galvanized |
| Material | Q235, Q345 |
| Standard | EN1065, EN39, BS, GB, JIS... |
| MOQ | Usually 500 pcs each size |
| Delivery time | 25-40 days(quantity less than 10000 pcs, if more, should be negotiated) |
| Service | OEM service is available. We can produce as your requests |
2.Detailed Images
3.Company Introduction
4.Factory and Processing workshop
5.Laboratory/Test Centre
In order to 100% meet customers' requests, we establish our own test centre. In the whole Tianjin City, few factories have their own laboratory.
6.Packing and Delivery
7.Related Products
We also have our own steel pipe factory which is even long running than the scaffolding factory.
- Similar Products