Swipe or use the arrows to view product images.
Steel Car Repair Self-Piercing Spr Rivets
| Price | $0.02 |
|---|---|
| Min Order | 10000 Pieces |
| Availability | In Stock |
| Shipping From | Jiangsu, China |
| Popularity | 253 people viewed |
Material:
Steel
Surface Finishing:
Zinc Plated
Certification:
ISO
Performance:
Eco-Friendly
Customized:
Customized
Transport Package:
Rolled on Roller
Specification:
STEEL
Origin:
China
HS Code:
7318
Product Description
Product Name | steel car repair self-piercing spr rivets |
Material | Steel |
Color | Whte zinc or Yellow zinc |
Head type | Flat head |
Packing | BOX+CARTON OR CARTON OR CARTON+PALLET |
Brand | Bounty |
Dia | You need |
Delivery time | Generally it is 3-5 days if the goods are in stock. or it is 30-45 days, it is according to quantity. |
Products Show
Application
steel car repair self-piercing spr rivets
- Athermal effect ―― Can be used for coating or plating plate connection without damaging its coating and without any damage;
- Low energy consumption;
- Short working cycle;
- Environmentally friendly process, no heat, smoke, steam, sparks, dust or debris, etc.;
- The riveting quality is stable and reproducible;
- The quality of riveted joints can be checked by visual inspection;
- Can be combined with adhesive technology;
- Automatic nailing system to ensure continuity of production.
- Athermal effect ―― Can be used for coating or plating plate connection without damaging its coating and without any damage;
- Low energy consumption;
- Short working cycle;
- Environmentally friendly process, no heat, smoke, steam, sparks, dust or debris, etc.;
- The riveting quality is stable and reproducible;
- The quality of riveted joints can be checked by visual inspection;
- Can be combined with adhesive technology;
- Automatic nailing system to ensure continuity of production.
Packing & Delivery
steel car repair self-piercing spr rivets
Packing Details : Carton or pallets or weaving bag, it is based on your need
Delivery Details : 30-45 days after order of Solid bicycle tire tubes
Packing Details : Carton or pallets or weaving bag, it is based on your need
Delivery Details : 30-45 days after order of Solid bicycle tire tubes
Certificate
Company Show
FAQ
Q: Are you trading company or manufacturer ?
A: We are Trading& factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 30-45 days if the goods are not in stock, it is according to quantity.
Q:Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=5000USD, 100% in advance. Payment>=5000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as above.
If you have another question, pls feel free to contact us as above.
- Similar Products
Negotiable
1 Piece (MOQ)
Rivetting Machine
Zhejiang Hengjiu Machinery Group Zhuji Chain Equipment Co., Ltd.
$50.00
10000 Thousand pieces (MOQ)
Stainless Steel Core Pulling Rivets
Northern Precision Technology (Suzhou) Co., Ltd