Swipe or use the arrows to view product images.
Steel Formwork System for Adjustable Columns
| Price | $1050.00 |
|---|---|
| Min Order | 1 Ton |
| Availability | In Stock |
| Shipping From | Beijing, China |
| Popularity | 519 people viewed |
Model NO.:
Column template
After-sales Service:
Yes
Warranty:
One Year
Certification:
ISO
Material:
Steel
Type:
Column Formwork
ODM or OEM:
Yes
Size:
Customized
Thickness:
Customized
Transport Package:
Container
Origin:
Aoyu
HS Code:
7308900000
Product Description
Basic Info.
| Model NO. | AY86,AY106,AY126, | Material | Steel Wood |
| Type | Pier pillar formwork | Specification | Q235B |
| Panel thickness | 6mm | Width | 500-6000mm |
| Maxmum lateral pressure | 80 kn/square meter | Height | 2000mm |
| Guardrail height | 1200mm | Appliation scope | Roads,Railways,Water conservancy |
| Number of Platform | 2m/layer | Width of Operating Platform | 900mm |
| Transport Package | Package Box, Steel Pallet, Steel Frame, Container | Brand | Aoyu |
| Origin | China | Production Capacity | 14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is renowned for its strength and durability, making it the ideal choice for repetitive use in construction projects. Its ease of assembly and fixed shape make it perfect for large-scale applications such as high-rise buildings, roads, and bridges.Packaging:
1. The total net weight of a loaded container typically ranges from 22 to 25 tons. This must be confirmed prior to loading.2. We employ various packaging methods tailored to different products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we generally require 20-30 days after receiving the customer's down payment.
2. Transportation: The delivery time varies depending on the destination port.
3. Special requirements will be accommodated through negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with our own two factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products used forbridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, formwork layout drawings, and quotations to construction project stakeholders, including owners, design institutes, and contractors.
B: We supply our products to contractors, construction companies, material suppliers, and trading firms.
C: We collaborate internationally with peer companies, offering our exceptional formwork products.
Q4: How long does it take to create a preliminary design and quotation after receiving the structural drawing?
A: Typically, it takes3
~7 days, depending on the specific project requirements.
Q5: How long does it take to manufacture products after the contract is signed?
A: Generally, it takes 30~60 days, depending on the type and quantity of products to be produced.
Q6: What are your payment terms?
A: We require a 30% T/T advance, with the balance due before shipment.
- Similar Products
$88.00
300 Square Meters (MOQ)
Lianggong H20 Timber Beam Formwork for Core Wall Column Slab Table Formwork
YANCHENG LIANGGONG FORMWORK CO., LTD.
$79.00
100 Square Meters (MOQ)
Advanced Construction Formwork for Easy Install Building Material Needs
Qingdao Jiuying Formwork & Scaffolding Co., Ltd.
$15.00
500 Meters (MOQ)
2.9m H20 Wooden Beam Formwork Making Machine Formwork H Beam
TIANJIN ZHIYI METAL PRODUCTS CO., LTD
Negotiable
1000 Square Meters (MOQ)
Safe Simple Green Steel Formwork Aluminium Formwork for Construction
Qingdao Scaffolding Import and Export Co., Ltd.