$200.00
100 Pieces (MOQ)
Light Waffle Slab Formwork for Concrete Waffle Formwork
Suzhou Topo New Material Co., Ltd.
Swipe or use the arrows to view product images.
Steel Formwork System for Viaduct Construction
| Price | $1050.00 |
|---|---|
| Min Order | 1 Ton |
| Availability | In Stock |
| Shipping From | Beijing, China |
| Popularity | 337 people viewed |
Model NO.:
Column template
After-sales Service:
Yes
Warranty:
One Year
Certification:
ISO
Material:
Steel
Type:
Column Formwork
ODM or OEM:
Yes
Size:
Customized
Thickness:
Customized
Transport Package:
Container
Origin:
Aoyu
HS Code:
7308900000
Product Description
Basic Info.
| Model NO. | AY86,AY106,AY126, | Material | Steel Wood |
| Type | Pier pillar formwork | Specification | Q235B |
| Panel thickness | 6mm | Width | 500-6000mm |
| Maxmum lateral pressure | 80 kn/square meter | Height | 2000mm |
| Guardrail height | 1200mm | Appliation scope | Roads,Railways,Water conservancy |
| Number of Platform | 2m/layer | Width of Operating Platform | 900mm |
| Transport Package | Package Box, Steel Pallet, Steel Frame, Container | Brand | Aoyu |
| Origin | China | Production Capacity | 14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System stands as a testament to strength and durability, ideal for repeated use across various construction projects. Effortless in assembly and erection, this system is tailored to meet the demands of high-volume, same-structure applications such as high-rise buildings, roads, and bridges. It offers a fixed shape and structure, ensuring consistency and reliability on every project.Packaging:
1. Generally, the total net weight of a loaded container ranges from 22 to 25 tons, which must be confirmed prior to loading.2. Different packages are tailored for different products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are secured in bags and placed on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, production typically requires 20-30 days following receipt of the customer's down payment.
2. Transportation: Lead times vary depending on the destination port's charges.
3. Special requirements necessitate further negotiation.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two dedicated factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products primarily used forbridge and tunnel construction.
Q3: What can you do for us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, or contractors.
B: We supply our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: Our outstanding formwork products are also available to support our peers worldwide.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after contract signing?
A: Typically, it takes 30~60 days, contingent upon the type and quantity of products ordered.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.
- Similar Products
$120.00
500 Square Meters (MOQ)
Panel Prop Shoring Formwork System for Concrete Construction
Qingdao Scaffolding Import and Export Co., Ltd.
$200.00
100 Pieces (MOQ)
Popular Ribbed (waffle) Slab Concrete Formwork for Construction
Suzhou Topo New Material Co., Ltd.
$200.00
100 Pieces (MOQ)
Customized Plastic Waffle Slab for Concrete Injection Moulding
Suzhou Topo New Material Co., Ltd.