$60.00
30 Pieces (MOQ)
Aluminum Scaffold Stairs Scaffolding Stairways with Hook
Laian Golden Resource Metalwork Co., Ltd
Swipe or use the arrows to view product images.
Steel Frame System Scaffolding
| Price | $750.00 |
|---|---|
| Min Order | 1000 Pieces |
| Availability | In Stock |
| Shipping From | Tianjin, China |
| Popularity | 481 people viewed |
Material:
Steel
Type:
Fixed
Structural Style:
Doors Scaffolding
Framework:
Combined Scaffolding
Supporting Mode:
Projecting Scaffolding
Lapping Form:
Full Scaffolding
Erection Position:
External Scaffolding
Move Method:
Attached Lifting Scaffolding
Scaffolding Part Type:
Scaffolding Frames
Construction Properties:
Installation Scaffold
Trademark:
TYT
Transport Package:
in Bundles
Origin:
Tianjin, China
HS Code:
7308400000
Product Description
| Spanish Prop | |||
| Adjustable Length | Out Tube | Inner Tube | Wall Thickness |
| 800-1400mm | 48mm | 40mm | 1.5-2.5mm |
| 1600-3000mm | 48mm | 40mm | |
| 2000-3500mm | 48mm | 40mm | |
| 2200-4000mm | 48mm | 40mm | |
| Surface Treatment | Painted, Power Coated, Electro Galvanized or Hot Dip Galvanized | ||
| Italian Prop | |||
| Adjustable Length | Out Tube | Inner Tube | Wall Thickness |
| 1600-2900mm | 56mm | 48mm | 1.5-2.75mm |
| 1800-3100mm | 56mm | 48mm | |
| 2000-3600mm | 56mm | 48mm | |
| 2200-4000mm | 56mm | 48mm | |
| Surface Treatment | Painted, Power Coated, Electro Galvanized or Hot Dip Galvanized | ||
| Middle East or German Prop | |||
| Adjustable Length | Out Tube | Inner Tube | Wall Thickness |
| 1400-2700mm | 60.3mm | 48.3mm | 1.6-4.0mm |
| 1600-2700mm | 60.3mm | 48.3mm | |
| 1620-2640mm | 60.3mm | 48.3mm | |
| 2000-3500mm | 60.3mm | 48.3mm | |
| 2200-3500mm | 60.3mm | 48.3mm | |
| 3000-5500mm | 60.3mm | 48.3mm | |
| Surface Treatment | Painted, Power Coated, Electro Galvanized or Hot Dip Galvanized | ||
1. Safe, Simple and quick on-site erection
2. High efficiency with strong loading capacity
3. With galvanized surface(endurable)
4. Widely application in propping system such as construction, plants
5. Quick and accurate height adjustment
Company Profile
1.Port: TIANJIN
2.Payment Terms: L/C,T/T
3.Delivery: 15-45 days after deposit or according to customers' quantity.
4.Packing: 1.Big OD: in bulk 2.Small OD: packed by steel strips 3.woven cloth with 7 slats
4.plastic bags 5.as per customer's option
Our Services
1.Customization is avaliable according to requirements.
2.All production processes are strictly under ISO 9001-2008.
3.Free sample ( not contain the cost of freight).
4.Third party inspection (SGS,BV...) is welcomed.
5.Visit factory any time.
6.FOB/ CIF/ CFR/ ERW is accepted.
- Similar Products
$20.00
500 Pieces (MOQ)
Heavy Duty Scaffolding Prop for Concrete Slab Formwork
HORIZON FORMWORK CO., LTD.