$99.00
1000 Pieces (MOQ)
Galvanized Screw Piles for Foundation Repair
Jinan Better Mechanical Equipment Co., Ltd.
Swipe or use the arrows to view product images.
Steel Shed Metal Construction Frame Workshop Warehouse Prefabricated Steel Structure Building
| Price | Negotiable |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 274 people viewed |
After-sales Service:
More Than 50 Years
Characteristics Of Goods:
Finished Goods Warehouse
Type:
Stereoscopic Warehouse
Steel Type:
Structural Steel
Application:
Steel Structure Warehouse
Service:
Design, Engineering, Erection
Main Steel Frame:
H Steel, Z or C Purlin
Cladding Material:
Steel Color Sheets/Sandwich Panels
Surface Treatment:
Painting and Hot DIP Galvanize
Connection Form:
Bolt Connection
Design Parameter:
Wind Load, Snow Load and Earthquake
Transport Package:
Standard Seawrothy Packing
Specification:
Customized
Origin:
Shandong Province, China
HS Code:
730890
Product Description
A:We are manufacture faclory, You are welcomed to visit us at any time, in the workshop,it has acomplete advanced equipment system for making steel struclures and panels, So we can makesure the good qualiy ancf also the corpelitive pnce.
Q:How about your quality control?
A:Our products have passed CE EN1090 and 1S09001-2008.
Q:Can you offer design service?
A:Yes,we have an engineer team and can design for you according to yourrequirements.Architecturaldrawing,structure diagram,processing detai drawing and installation drawing will be made and let youconinn in diferent fine ofthe projeet
Q:What's the delivery time?
A:The delivery time depends on the size and quantity of building.Generally within 30 days after receivingthe payment.And partial shipment is allowed for big order.
Q:Do you offer service for installation?
A:W'e will fumish you the detailed construction drawing and the construction manuaf which could help youto erect and install the building step by step. We also could send the engineer to your local to help youif neede.
Q:What's the payment term?
A:30% deposit and 70% balance before shipment.
How to get a quote from you?
You can contact us by emai, phone, WhalsApp, Skype and so on 24*7 and you will gelreoly within anytirne.
- Similar Products
Negotiable
300 Square Meters (MOQ)
China Fabricated Steel Structure Warehouse/Shed/Hanger
Qingdao Doublegrand Metal Products Co., Ltd.
$15.00
500 Pieces (MOQ)
EPS Panel with Galvanized Mesh Wire
SHIJIAZHUANG YAJIADA METAL PRODUCTS CO., LTD.
$29.90
1 Square Meter (MOQ)
Steel Structure Storage Tent / Warehouse/ Fabric Building (JIT-407021PT)
Qingdao Jitcover Trading Co., Ltd.
$30.00
1000 Square Meters (MOQ)
Construction Design Steel Structure Workshop Building
Guangdong Union Steel Structure Material Co., Ltd.
$50.00
100 Square Meters (MOQ)
Steel Structure Building Materials Prefabricated Steel Structure Supermarket
Joinedfortune Technology (Shenyang) Co., Ltd.