Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

T2AC SPD60ka Solar PV DIN Practical Rail Lightning Protection Arrester Voltage Limiting

Price Negotiable
Min Order 2 Pieces
Availability In Stock
Shipping From Zhejiang, China
Popularity 302 people viewed
Model NO.:
LD-MD-A80
Type:
T1, T2, T1+T2
Application:
AC/DC System
Size:
Small
Operation Voltage:
Low Voltage
Shape:
Cuboid
Certification:
ROHS
Brand:
Customized / Leidun
Application:
AC/DC System
Size:
Small
Operation Voltage:
Low Voltage
Shape:
Cuboid
Certification:
RoHS, RoHS
Type:
T1, T2, T1+T2
Brand:
Customized / Leidun
Breaking Capacity:
High Voltage Circuit Breakers
Speed:
Normal Type Circuit Breaker
Operation:
Manual Automatic
Installation:
Fixed or Withdrawable
Structure:
SPD
Product Name:
T2 Surge Protector
Model:
Ld-MD-A80
Trademark:
customizable
Origin:
China
Product Description

Product Overview

The AC T2 Class Surge Protector Device (SPD) is installed in IPZ0-1 and above to protect low voltage equipment from lightning strike and surge damage. Applicable to PSD I+II class (B+C class) of various power supply systems. Designed according to IEC 61643-1/GB/T18802.1.

This product has the following features: 10/350μs, 8/20μs spark gap. It adopts sealed GDT technology, high discharge current capacity, extremely low voltage protection level, double terminals in parallel or series, multifunctional connection of conductors and busbars. In the event of a fault, the green window will turn red and a remote alarm terminal is provided. It uses high-performance MOV and can handle a maximum of up to 10/350 7kA.

 



 

Q1. Can I get samples?
Yes. If you have any needs, please contact us and we will respond within 24 hours. 

Q2. Can I use other logos or designs on the products?
Yes, we provide OEM/ODM services, you can customize products with other logos and designs.

Q3. Do you have factories?
Yes, we have factories in Jiangsu and Zhejiang, welcome to visit our company.

Q4. How do you ensure quality?
We have a complete quality management system, use qualified raw materials, conduct quality inspections in different production links, regularly collect user feedback, and trace the source in time when quality problems occur, and keep records to prevent repeated errors.

Q5. How long does it take to prepare after placing an order?
Usually it takes 5~7 days, it also depends on the quantity of the order.
  • Similar Products
Full Page Contact Supplier