Swipe or use the arrows to view product images.
Tailored Fully Automatic Customized Powder Coating Spraying Line Manufacture
| Price | $100000.00 |
|---|---|
| Min Order | 1 Set |
| Availability | In Stock |
| Shipping From | Hebei, China |
| Popularity | 486 people viewed |
Model NO.:
powder coating booth
After-sales Service:
Video and Overseas Service
Warranty:
2 Years
Type:
Coating Production Line
Coating:
Powder Coating
Substrate:
Steel
Certification:
CE, ISO
Condition:
New
Control:
PLC Touch Screen
Spray Gun:
Gema/Dber
Oven Insulation Material:
150mm Rock Wool
Booth Material:
PVC/PP
Recovery:
Cyclone+Filters
Heat Energy:
Gas/LPG/Diesel
Package:
Wooden Cases Mental Frame
Trademark:
ZhYao
Transport Package:
Customized
Origin:
China
HS Code:
8424300000
Product Description
| No. | Process Name | Process Parameter | Mode | Remarks | |
| Temperature | Time | ||||
| 1 | Loading | RT | |||
| 2 | Pre treatment | 35-50ºC | 15-20 min | Automatic | Adjustable |
| 3 | Drying Oven | 100-120ºC | 15-20 min | Automatic | Adjustable |
| 4 | Cooling | RT | 5-10 min | ||
| 5 | Powder coating | RT | 3-5min | Automatic and Manual | Adjustable |
| 6 | Curing | 200-220ºC | 30-35 min | Automatic | Adjustable |
| 7 | Cooling | RT | 10-15 min | ||
| 8 | Unloading | RT | |||
The process of recovery system
1.Are you a trader or a factory?
We are manufacturer and exporter.
Our own factory was found in 1995,Our export office was established in 2014.
2.What should I provide if interested in your powder coating equipment ?
A.The material/size(max)/weight(max)of your workpiece.
B.How many of your daily output(one day=8hours,one month=30days)?
C.What heating power do you prefer: electric, gas, diesel or coal?
D.The size of your factory(length, width and height)?
3.How to ensure the quality of the equipment?
A,We have hundreds of patents and passed the IS9001:2015 quality management system certification.
B,The Technical Review Committee, reasonably determines and divides the stages of design, production, installation and commissioning, and formulates detailed progress plans for each stage,Strengthen the quality assurance system and quality protection measures of equipment manufacturing department.
C,We manning quality inspectors specially to control the processing quality of product strictly.
4.How to install equipment after purchasing your equipment?
A,We will provide installation information and installation videos
B,Our engineers will guide the installation and run the equipment.
C,After the debugging, will provide complete training and track customer device usage.
5.How is your company's after-sales service done?
A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.
B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.
C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.
D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.
Feel free to contact with us to get your design .
- Similar Products
$3500000.00
1 Set (MOQ)
Hito Color Coating Line, Coil Coating Machine
Weifang HiTo Equipment Engineering Co., Ltd.
$190000.00
1 Set (MOQ)
Electro Galvanized Steel Wire Machine
Zhangjiagang Meywada International Trading Co., Ltd.
Negotiable
1 unit (MOQ)
Galvanized Steel Wire Making Equipment Supplier
Wuxi Xinrun Industrial Furnace Co., Ltd.