Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Taper Cross & X Bit Mzcr45-T14*8-7 for Top Hammer Drilling

Price $17.05
Min Order 1 Piece
Availability In Stock
Shipping From Hubei, China
Popularity 236 people viewed
Model NO.:
MZCR45-T14*8-7
Certification:
ISO 9001:2000, SGS
Standard:
GB
Surface Treatment:
Spray-Paint
Manufacturing Process:
Forging
Material:
Carbon Steel
Model:
Mzcr45-T14*8-7
Taper:
7"
Usage:
Pneumatic, Coal, Water Well, Mining
Can It Be Customized?:
Yes.
Trademark:
MING
Transport Package:
Wooden Case
Origin:
Made in China
HS Code:
8207199000
Product Description
Taper Cross & X Bit MZCR45-T14*8-7 for Top Hammer Drilling
 
Product Description

Application: Tapered drill bits are used in granite and marble quarry, gold mine, railway, tunnel, etc. for drilling

Feature: Tapered drill bits connect tapered drill steel of rock drill for drilling holes
Types: Tapered chisel bit,tapered cross bit and tapered button bit.
The drilling depth is usually 15m-18m of hardness grade F8-14. 

 
Technical Date

 
Product Application

Our Service

FAQ

1. How to order the products?

A: Please send the inquiry with detail item description or with Model number.

 

2. Can I expect a quality products?

A: Yes. mature production technology ensuring the quality satisfy international request.

 

3. How to check the product are the exact one you want?

A: If possible, please attach one reference picture to avoid any misunderstanding or any links from ourwebsite for a better understanding.

 

4. How to make sure the quality?

A: More than 40 Years engineer to make sure the quality, 100% inspection.

 

5. What is the general delivery time?

A: 15 working days for DTH bits.

20-25 working days for DTH hammer

3-5 working days for ex stock items.

 

6. Methods of Payment

A: T/T (Telegraphic Transfer) or Western Union.

 
Packaging & Shipping

Packed by Carton or Wooden cases.
Delivery:

  1. Goods in stock can be delivered within 5 days.
  2. DTH Bits production time is about 15 days.
  3. DTH Hammer product time is about 30 days.

Transprotation: By air, By Express or By sea / By train , according to your requests.

 

More products:


 






  • Similar Products
Full Page Contact Supplier