Swipe or use the arrows to view product images.
Teckey Automatic Door Back up Power with Lithium Battery
| Price | $55.00 |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Jiangsu, China |
| Popularity | 465 people viewed |
Model NO.:
TK-718A
Type:
Lithium-Ion Batteries
Usage:
Automatic Door
Nominal Voltage:
24V
Discharge Rate:
Medium Discharge Rate
Shape:
Flat Battery
Electrolyte:
Li-ion
Installation:
Fixed
Rechargeable:
Non-Rechargeable
Output Voltage:
DC 24 V.
Input Voltag:
AC 220 V. +/-5%
Capacity:
2200 mAh
Charging Lead:
About 16 Hours
Open Rate:
500 Times
Work Mode:
Automatic
Charge Indicator:
LED Light
Charge Protection:
Auto-Cut When Power Is Low
Warning:
Keep Away From Fire and High Heat
Trademark:
Teckey
Transport Package:
Export Carton
Specification:
96(L)*43(W)*55(H)mm
Origin:
Jiangsu, China
HS Code:
8301400000
Product Description
This is specially designed for emergency backup power supply for automatic doors, suitable for scenarios that automatic door applications are troubled by blackouts, such as evacuation requirements. The battery is usually integrated inside the whole system and installed together, which effectively solves the cumbersome control plan.
Battery charge-discharge is management by micro-computer. Have setting of quick charge, trickle charge and cut off the power automaticallly in low tension. The working time of battery is normally 3-5 years. Change the battery as it declines after long use.
Upon installation or adjustment , put the battery into track in 30° incline.
Step1: Put the battery pack into guide rail, shipping to suitable position and fix by special screws.
Step2: Adjust the position of battery.
Note: Loosen the screw before adjustment.
Step3: The connection between battery and main controller.
Battery charge-discharge is management by micro-computer. Have setting of quick charge, trickle charge and cut off the power automaticallly in low tension. The working time of battery is normally 3-5 years. Change the battery as it declines after long use.
Upon installation or adjustment , put the battery into track in 30° incline.
Step1: Put the battery pack into guide rail, shipping to suitable position and fix by special screws.
Step2: Adjust the position of battery.
Note: Loosen the screw before adjustment.
Step3: The connection between battery and main controller.
- Similar Products
$168.00
10 Pieces (MOQ)
AGM VRLA Battery 250ah 12V Solar Gel Battery for Solar Stoage System
SAIL ENERGY CO., LTD
$245.80
18 Pieces (MOQ)
Rechargeable AGM Deep Cycle Battery 2V 800ah
Guangzhou Xuntian Electronic Technology Co., Ltd.