Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Top Quality Baltimore Bac Evapco Marley Evaporative Condenser Cooling Tower Fan

Price $2500.00
Min Order 1 Piece
Availability In Stock
Shipping From Shandong, China
Popularity 269 people viewed
Model NO.:
BAC VXC
After-sales Service:
Oversea Engineer Service Available
Warranty:
24 Months
Cooling Method:
Water Cooling
Ventilation Mode:
Mechanical Ventilation
Material:
Stainless Steel
Air Contact Form:
Wet and Dry
Air Contact Way:
Closed and Open
Tower Shape:
Square
Noise Level:
Low
Application Fields:
Industrial
Certification:
ISO, CE, CCC
Condition:
New
Brand:
Bac, Evapco, Marley
Fan Air Duct Material:
Stainless Steel/HDG
Fan Blades Material:
Aluminum-Alloy
Air Volume:
Customized
Drive Type:
Driect Drive/Belt Drive
Dimension:
Customized
Trademark:
bac, marley, evapco
Transport Package:
Wooden Package for Sea or Air Transportation
Specification:
suitable to container loading
Origin:
China
HS Code:
8419500090
Product Description

Top Quality Baltimore Bac Evapco Marley Industrial Evaporative Condenser Cooling Tower Fan 

Product Description

High Quality Cooling Tower Fans For Marley, BAC Evapco cooling towers and evaporative condensers.

Detailed Photos

World famous brand cooling tower spare parts available, such like infill, belt, spraying nozzles, gearbox, fans, pumps, coil etc...

Our Advantages

1, Dimension 100% Replaceable To The Original Ones
2, Top Quality, Reliable And Durable
3, Performance Guaranteed
4, Cost Effective
5, Quick Delivery

Product Parameters
ItemBrandSpecificationSupplierData Required For ConfirmationDelivery Time
Cooling FanBAC, Evapco, Marley Same to originalCHT TECKNameplate, Model and Series Number15-25 days
CoilBAC, Evapco, Marley Same to originalCHT TECKNameplate, Model and Series Number15-25 days
Fill and Drift EliminatoBAC, Evapco, Marley Same to originalCHT TECKNameplate, Model and Series Number15-25 days
Packaging & Shipping

Wooden package for sea or air transporation, suitble for LCL and Container shipping.

FAQ

Q: What's the lead time? 
A: Usually 15-30days after PO confirmed

Q: What's the payment term? 
A: Usually T/T or L/C

Q: What kind of shipping methods available? 
A: Sea, Air, Railway transportaion are all available. 

  • Similar Products
Full Page Contact Supplier