Swipe or use the arrows to view product images.
Tunnel Machining Lining Trolley Self-Reacting Steel Formwork Machinery for Construction
| Price | $300000.00 |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Henan, China |
| Popularity | 386 people viewed |
Model NO.:
GF-CQTC
After-sales Service:
Yes
Warranty:
Negotiated
Theoretical Weight:
125 Tons
Material:
Q235B
Drive Motor Power:
2X7.5kw
Tunnel Radius:
6.7m
Walking Speed:
6m/Min
Hydraulic Cylinder Stroke:
200mm-600mm
Hydraulic Motor Power:
5.5kw
Hydraulic System Pressure:
20MPa
Other:
Parameters May Be Adjusted for Specific Projects
Trademark:
Gaofeiqiaosui
Transport Package:
Standard Packaging
Specification:
6.1m, 9.1m, 10.5m, 12.1m
Origin:
Luoyang, Henan
HS Code:
8480600090
Product Description
Product advantages: reasonable structure, advanced technology, convenient installation, high strength, good stability, high surface smoothness of lining, and fast lining speed.
Intelligent information pouring lining trolley:
In order to solve the problem of key indicators in the construction process of traditional lining trolleys that cannot be fully digitized and displayed on screen, and to improve the quality of concrete operations completed by the trolleys, our company has launched a new generation of intelligent information pouring lining trolleys, which include: automatic pouring system for window by window pouring, temperature and humidity detection, pouring flow measurement, video monitoring system, arch pressure monitoring system, lap in place detection, pouring liquid level height detection Information cloud platform, intelligent vibration system, automatic track laying and walking system, anti hole warning system, visual sealing device, soft lap, etc. Through the above configurations, tunnel lining construction visualization, digitization, intelligence, and informatization are achieved, making construction easier, supervision simpler, and quality more reliable.
In order to solve the problem of key indicators in the construction process of traditional lining trolleys that cannot be fully digitized and displayed on screen, and to improve the quality of concrete operations completed by the trolleys, our company has launched a new generation of intelligent information pouring lining trolleys, which include: automatic pouring system for window by window pouring, temperature and humidity detection, pouring flow measurement, video monitoring system, arch pressure monitoring system, lap in place detection, pouring liquid level height detection Information cloud platform, intelligent vibration system, automatic track laying and walking system, anti hole warning system, visual sealing device, soft lap, etc. Through the above configurations, tunnel lining construction visualization, digitization, intelligence, and informatization are achieved, making construction easier, supervision simpler, and quality more reliable.
- Similar Products