Swipe or use the arrows to view product images.
UL&FM Black Malleable Iron Pipe Fittings Tee for Fire Fighting System
| Price | $3.93 |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Hebei, China |
| Popularity | 282 people viewed |
Model NO.:
130
After-sales Service:
24 Hours Online
Warranty:
1 Year Warranty
Type:
Equal
Connection:
Female
Material:
Malleable Iron
Shape:
Equal Tee
Lateral:
90°Tee
Head Code:
Round
Wall Thickness:
Sch40/Sch80/Std
Finish:
Hot Galvanized
Technics:
Casting
Pressure Rating:
150lb
Standard:
NPT, BS, DIN
Certification:
UL&FM&ISO9001
Working Pressure:
1.6MPa Hydraulic Pressure
Surface Treatment:
Electro Galvanized, Hot Dipped Galvanized and Norm
Application:
Fire Fighting, Plumbing, Oil, Gas, Decoration, Inf
Transportation Mode:
by Sea, by Railway or by Air
Delivery:
30-50 Days Qfter Prepayment
Trademark:
G
Transport Package:
Seaworthy Cartons
Specification:
1/4"-6"
Origin:
China
HS Code:
73071900
Product Description
| MALLEABLE IRON PIPE FITTINGS DETAILS | |
| Material | Galvanized Malleable Iron |
| Standard | British Standard, American Standard, DIN standard |
| Chemical Property | (C% 2.4-2.9), (Si%1.4-1.9), (Mn% 0.4-0.65), (P% <0.1), (S% <0.2) |
| Physical Property | Tensile Strength>=300Mpa, Elongation>=6%, Hardness<=150HB |
| Testing Pressure | 2.5Mpa Hydraulic Pressure |
| Working Pressure | 1.6Mpa Hydraulic Pressure |
| Type | Banded, Beaded, Plain |
| Surface Treatment | Electro Galvanized, Hot Dipped GalvanizedGalvanized |
| Series | Standard |
| Application | Fire Fighting, Plumbing, Oil, Gas, Decorations, Infrastructure and Construction |
| Transportation Mode | By Sea, By Railway, By air |
| Delivery | 30-50days after prepayment |
| Standard Details | ||||
| Materials | Dimension | Galvanized | Threads | |
| NPT | ASTM A-197 | ASME B16.3 16.14 | ASTM A153 | ANSI B1.20.1 |
| ANSI/ASME/A197-79 | ANSI/ASME B16.3-85 | ANSI/ASME B1.20.1 | ||
| BSPT | ASTM A-197 | BS EN 10242 | ASTM A153 | ISO 7/1 |
| EN1562 | BS 143&1256 | |||
| ISO5922 | ISO49 | |||
| DIN | ASTM A-197 | DIN EN 10242 | ASTM A153 | ISO 7/1 |
| EN1562 | ISO49 | ISO 1460 | DIN 2999 | |
| ISO5922 | DIN2950 | |||
| DIN 1692 | ||||
Shijiazhuang Jizhong Malleable Iron Co., Ltd was established in 1990, with more than 20 years of production and sales experience. Our factory covers an area of 15,000 square meters with 150 employees, of whom 10 are quality control personnel, with perfect testing equipment. The company has passed the ISO9001:2015 management system certification and BV certification. And our products have passed the UL&FM fire safety certification which are safe and reliable.
Yes, our factory was set up in 1990
2.How to confirm the goods quality before placing orders?
We have a perfect quality inspection system to ensure the quality of products.
3.Acceptable payment methods?
We can accept T/T, L/C, O/A, etc
4.How long will it take to deliver?
Generally 30-50 days delivery.
- Similar Products
$7.10
1000 Pieces (MOQ)
PPR Male Tee Type a Fitting for Building Materials
Ningbo Minde Building Materials Co., Ltd.
$27.00
100 Pieces (MOQ)
Hotdipped Galvazied Banded Iron Equal Tee with NPT Threads
Hebei Jinmai Casting Co., Ltd.