Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Vertical Shaft Planetary Cement Mixer with Hydraulic Power Unit

Price $15000.00
Min Order 1 piece
Availability In Stock
Shipping From Shandong, China
Popularity 501 people viewed
Model NO.:
cmp750
After-sales Service:
24hours Support
Application Area:
Road Construction
Capacity:
15m�/h & Above
Certification:
ISO
Condition:
New
Main Material:
Alloy Steel, Aluminum, Carbon Steel, Stainless Steel
Mixing Capacity:
500-999L
Mixing Drum Shape:
Drum
Power Source:
Electric
Safety Features:
Anti-Slip Feet, Emergency Stop Button, Overload Protection, Safety Lock
Stirring Type:
Diving
Warranty:
1year
Working:
Shear Mixer
Advantage:
Driving System
Water Device:
Overhead Structure
Customized:
Yes
Wheeled Structure:
Easy to Move
Trademark:
rheinsen
Transport Package:
Wooden Tray Package
Specification:
2230*2080*1880
Origin:
China
HS Code:
8474390000
Product Description

Vertical shaft planetary cement mixer with hydraulic power unit

 
 
Company Profile

 

Mittelrhein international company is located in Shandong Logistics Center, featuring high-efficiency domestic logistics in China and low-cost logistics expenses.
Shandong is a major heavy industry hub in China. With 20 years of procurement history, our team provides efficient and high-quality services. We have long-term partnerships with hundreds of different factories, all of which have passed our product quality selection.
Our international procurement team is dedicated to providing high-quality products and reliable after-sales services, solving the after-sales issues of overseas buyers. Our international logistics have also been carefully selected.
The long-term partner logistics companies
possess highly flexible control capabilities, whether it is rail transportation, sea transportation, or combined transportation. The routes and emergency transfer operations are very mature and experienced, which can better reduce unnecessary effort, time, and shipping cost losses for our customers.
Product Description

 

  1.  This vertical shaft planetary mixer(0.5 cubic),with compact structure and stable transmission
  2. Hydraulic pump station: The unloading method adopts hydraulic unloading (pneumatic unloading is optional), and the unloading door can be opened manually in an emergency.
  3. Inspection door: safe and convenient inspection; the mixing condition can be observed during operation without cutting off the power supply.
  4. Stirring device: The stirring principle is revolution + rotation. The stirring blade is designed as a parallelogram structure to improve the utilization rate and life of the blade..
  5. Water channel device: upper water channel, the nozzle adopts spiral solid conical nozzle, uniform atomization effect, uniform stirring.
  6. High mixing efficiency, uniform mixing, no dead angle, 1 planetary shaft, 2 mixing arms, 1 unloading scraper, 1 side scraper.
  7. 7.Hydraulically driven discharge door opens and close.
Detailed Photos

 

Our Advantages

 

 
Product Parameters
        Type                                                  concrete mixerCMP50CMP100CMP150 CMP250 
Output capacity(L)50100150250
Input capacity(L)75150225375
Output weight(Kg)120240360600
Mixing power(Kw)35.57.511
Dischar ging power(Kw)optional
Planet/mixing arm 1/2 1/2 1/2 1/2
Paddle(nr)1111
Discharging paddle(nr)1111
Weight(Kg)700   
Lifting power(Kw)    
Dimension(L*W*H,mm)950*790*12001670*1460*14501670*1460*16201860*1650*1780
        Type                                                  concrete mixerCMP330 CMP500 CMP750 CMP1000
Output capacity(L)3305007501000
Input capacity(L)50075011251500
Output weight(Kg)800120018002400
Mixing power(Kw)1518.53037
Dischar ging power(Kw)optional
Planet/mixing arm 1/2 1/2 1/3 2 / 4
Paddle(nr)1111
Discharging paddle(nr)1111
Weight(Kg)  39006200
Lifting power(Kw)  7.511
Dimension(L*W*H,mm)1870*1870*18552230*2080*18802580*2340*21952890*2602*2220
 
Packaging & Shipping
 
 
After Sales Service

 


1.24 hours support.
2.Arrange the install and test without delay.
3.One year guarantee for probems caused by quality.
4.Supply spare parts in time.
5.Engineers can conduct on-site surveys as requested by the client.





 
 
Download information
You can find information click here!

 

  • Similar Products
Full Page Contact Supplier