$70.00
10 pieces (MOQ)
European Standard Size Loaf Magnets for Precast Concrete
Ningbo Wewin Magnet Co., Ltd.
Swipe or use the arrows to view product images.
Viaduct Column Formwork System with Custom Features
| Price | $1050.00 |
|---|---|
| Min Order | 1 Ton |
| Availability | In Stock |
| Shipping From | Beijing, China |
| Popularity | 481 people viewed |
Model NO.:
Column template
After-sales Service:
Yes
Warranty:
One Year
Certification:
ISO
Material:
Steel
Type:
Column Formwork
ODM or OEM:
Yes
Size:
Customized
Thickness:
Customized
Transport Package:
Container
Origin:
Aoyu
HS Code:
7308900000
Product Description
Basic Info.
| Model NO. | AY86,AY106,AY126, | Material | Steel Wood |
| Type | Pier pillar formwork | Specification | Q235B |
| Panel thickness | 6mm | Width | 500-6000mm |
| Maxmum lateral pressure | 80 kn/square meter | Height | 2000mm |
| Guardrail height | 1200mm | Appliation scope | Roads,Railways,Water conservancy |
| Number of Platform | 2m/layer | Width of Operating Platform | 900mm |
| Transport Package | Package Box, Steel Pallet, Steel Frame, Container | Brand | Aoyu |
| Origin | China | Production Capacity | 14000square meter/Month |
Product Description
Steel Formwork System
The Steel Formwork System is celebrated for its strength and durability, making it an optimal choice for repeated use in various construction projects. This system boasts easy assembly and erection, perfect for high-rise buildings, roads, and bridges where uniform structures are paramount.Packaging:
1. Typically, the net weight of a fully loaded container ranges from 22 to 25 tons, which needs confirmation before loading.2. Various packaging methods are tailored for different products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For full container orders, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: Delivery time varies depending on the destination port.
3. Special requirements can be accommodated through negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two of our own factories.
Q2: What do you do?
A: We design and manufacture formwork products primarily used forbridges and tunnels.
Q3: What services can you provide us?
A: We provide suggestions, formwork layout drawings, and quotations to project owners, design institutes, and contractors.
B: We sell our products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our exceptional formwork products.
Q4: How long does it take to create a brief design and quotation after we provide the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products once the contract is signed?
A: Typically, it takes 30~60 days, depending on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.
- Similar Products
$100.00
1 Square Meter (MOQ)
Concrete Table Formwork for Slab Works From Manufacturer
SHANDONG MACPEX MACHINERY EQUIPMENT CO., LTD.
Negotiable
1000 Pieces (MOQ)
Concrete Wall Tie Formwork Plywood Flat Form Ties
Nanjing Wellmade Metalwork Co., Ltd.
$0.70
5000 Pieces (MOQ)
Formwork Springt Clamp for Tie Bars in Post Tensioning
HORIZON FORMWORK CO., LTD.
$5.00
100 Sets (MOQ)
Building Formwork Support System Accessories
Hebei Leige Technology Development Co., Ltd.
$800.00
400 Square Meters (MOQ)
Formwork Aluminium for High-Rise Building
TANGSHAN XINGHE TRADE CO., LTD.