$200.00
100 Pieces (MOQ)
Light Waffle Slab Formwork for Concrete Waffle Formwork
Suzhou Topo New Material Co., Ltd.
Swipe or use the arrows to view product images.
Viaduct Column Steel Formwork System for Structural Builds
| Price | $1050.00 |
|---|---|
| Min Order | 1 Ton |
| Availability | In Stock |
| Shipping From | Beijing, China |
| Popularity | 358 people viewed |
Model NO.:
Column template
After-sales Service:
Yes
Warranty:
One Year
Certification:
ISO
Material:
Steel
Type:
Column Formwork
ODM or OEM:
Yes
Size:
Customized
Thickness:
Customized
Transport Package:
Container
Origin:
Aoyu
HS Code:
7308900000
Product Description
Basic Info.
| Model NO. | AY86,AY106,AY126, | Material | Steel Wood |
| Type | Pier pillar formwork | Specification | Q235B |
| Panel thickness | 6mm | Width | 500-6000mm |
| Maxmum lateral pressure | 80 kn/square meter | Height | 2000mm |
| Guardrail height | 1200mm | Appliation scope | Roads,Railways,Water conservancy |
| Number of Platform | 2m/layer | Width of Operating Platform | 900mm |
| Transport Package | Package Box, Steel Pallet, Steel Frame, Container | Brand | Aoyu |
| Origin | China | Production Capacity | 14000square meter/Month |
Product Description
Steel Formwork System
Our Steel Formwork System is renowned for its exceptional strength and durability, making it a highly reusable solution in the construction industry. With ease of assembly and erection, this system is designed to maintain a fixed shape and structure, making it ideal for projects requiring a large volume of uniformly shaped structures, such as high-rise buildings, roads, and bridges.Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 tons to 25 tons, which must be confirmed prior to loading.2. We use different packaging methods tailored to specific products:
---Bundles: Suitable for items like timber beams, steel props, and tie rods.
---Pallet: Smaller parts are secured in bags and then placed on pallets.
---Wooden cases: Available upon customer's request for added protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production Timeline: For a full container, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: Timeframes depend on the destination charge port.
3. Special Requirements: Negotiation is essential for any bespoke needs.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil manufacturer with our own two factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products used forbridges and tunnels.
Q3: What can you offer us?
A: We provide expert suggestions, detailed formwork layout drawings, and competitive quotations for owners, design institutes, or contractors involved in construction projects.
B: We supply our products to contractors, construction companies, material suppliers, and trading firms.
C: We extend our support to global peer companies with our superior formwork products.
Q4: How long does it take to prepare a brief design and quotation after receiving the structural drawing?
A: Typically, it takes3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, it takes 30~60 days based on the type and quantity of the products to be produced.
Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the remaining balance due before shipment.
- Similar Products
$120.00
500 Square Meters (MOQ)
Panel Prop Shoring Formwork System for Concrete Construction
Qingdao Scaffolding Import and Export Co., Ltd.
$200.00
100 Pieces (MOQ)
Popular Ribbed (waffle) Slab Concrete Formwork for Construction
Suzhou Topo New Material Co., Ltd.
$200.00
100 Pieces (MOQ)
Customized Plastic Waffle Slab for Concrete Injection Moulding
Suzhou Topo New Material Co., Ltd.