$16.60
100 Pieces (MOQ)
Construction Formwork Wheel Buckle Scaffolding
Hebei Leige Technology Development Co., Ltd.
Swipe or use the arrows to view product images.
Viaduct Column Steel Formwork System for Structural Projects
| Price | $1050.00 |
|---|---|
| Min Order | 1 Ton |
| Availability | In Stock |
| Shipping From | Beijing, China |
| Popularity | 306 people viewed |
Model NO.:
Column template
After-sales Service:
Yes
Warranty:
One Year
Certification:
ISO
Material:
Steel
Type:
Column Formwork
ODM or OEM:
Yes
Size:
Customized
Thickness:
Customized
Transport Package:
Container
Origin:
Aoyu
HS Code:
7308900000
Product Description
Basic Info.
| Model NO. | AY86,AY106,AY126, | Material | Steel Wood |
| Type | Pier pillar formwork | Specification | Q235B |
| Panel thickness | 6mm | Width | 500-6000mm |
| Maxmum lateral pressure | 80 kn/square meter | Height | 2000mm |
| Guardrail height | 1200mm | Appliation scope | Roads,Railways,Water conservancy |
| Number of Platform | 2m/layer | Width of Operating Platform | 900mm |
| Transport Package | Package Box, Steel Pallet, Steel Frame, Container | Brand | Aoyu |
| Origin | China | Production Capacity | 14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork boasts unparalleled strength and durability, ensuring it can be reused multiple times in construction projects. Its user-friendly design makes assembly and erection seamless. With its fixed shape and structure, it is highly suited for projects requiring numerous identical structures, such as high-rise buildings, roads, and bridges.Packaging:
1. The total net weight of a loaded container typically ranges from 22 to 25 tons and must be verified before loading.2. Packaging varies depending on the product:
---Bundles: For timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: Typically, we require 20-30 days after receiving the customer's down payment for a full container.
2. Transportation: Duration depends on the destination charge port.
3. Special requirements will be addressed through negotiation.
FAQ
Q1:Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two dedicated factories.
Q2:What do you do?
A: We specialize in designing and manufacturing formwork products utilized inbridge and tunnel construction.
Q3:What services do you offer?
A: We provide expert suggestions, formwork layout drawings, and quotations to project owners, design institutes, and contractors.
B: Our products are sold to contractors, building companies, material suppliers, and trading firms.
C: We support our global peers with our superior formwork products.
Q4: How long does it take to produce a brief design and quotation after receiving the structural drawing?
A: Typically, it takes3
~7 days, depending on the specific construction project requirements.
Q5: How long does it take to manufacture the products after contract signing?
A: Generally, production takes 30~60 days based on product type and quantity.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.
- Similar Products
$80.00
100 Square Meters (MOQ)
China Hot Sales Transfer Block Wall Formwork
Jiaxing Wangzu Industrial Co., Ltd.
$55.00
300 Square Meters (MOQ)
Super Light Plastic Formwork for Shuttering
CHANGSHA XIANGJIA METAL MATERIAL TRADING CO., LTD.