Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Well Selling En14604 Approval Smoke Alarm

Price Negotiable
Min Order 1000 Pieces
Availability In Stock
Shipping From Zhejiang, China
Popularity 444 people viewed
Type:
Smoke Alarm
Power Source:
DC 9V
Alarm Response Threshold:
(0.08~0.15)dB/M
Visual Alarm Indicator:
Flashing Red LED
Low Battery Signal:
Audible Signal Each 30s for 32 Days
Hush Time:
8 Min
Operating Temperature:
(0~+50) Centigrade Degree
Installation Mode:
Ceiling Mounted
Certification:
Ce, RoHS
Application:
Home
Trademark:
NUMENS
Transport Package:
Colour Box, 100PCS/CTN
Specification:
CE
Origin:
Ningbo, China
HS Code:
8531100000
Product Description
SND-500 DC smoke alarms provide battery powered smoke detection and alarm functions within a single unit.
Advanced electronics in conjunction with a photoelectric smoke sensing chamber provide early detection of fire and high immunity against unwanted alarms.
SND-500 DC smoke alarms are battery powered, do not require a mains supply, and are suitable for general residential applications.
Features:

·   Photoelectric smoke sensor
·   Integrated indicator provides visual indication of an alarm condition
·   Test button verifies battery and alarm operation
·   Loud 85 dB sounder to alert occupants
·   Single DC 9 V user-replaceable battery provides up to 18 months operation under normal conditions
·   30 day low battery warning signal
·   Interconnection function available to connect up to 38 units together
·   Battery missing indicator
Ordering Information:
Part NumberInterconnect
SND-500-S-
SND-500-SI
FAQ:
Q1:Are you a manufacturer or trading company?
A1:Numens is a professional fire alarm system manufacturer.
 
Q2:What kind of production service do you provide?
A2:The whole fire alarm system,include Addressable system, Conventional system, Residential system and so on....
 
Q3:What kind of certification do you have?
A3:Numens was EN,BSI,UL,SGS certified and all the products were produced under these major international standard .
 
Q4:What is the lead time for new order?
A4:The lead time for new order is 25 days after confirm order.
 
Q5:How do I get price information?
A5:Sales representatives are responsible for providing detailed price information within 1 workday after get your inquiry.
  • Similar Products
Full Page Contact Supplier