Swipe or use the arrows to view product images.
Whoesale Bulk Bulldozer Track Plate Excavator Track Shoe From Construction Machinery Parts Manufacturer
| Price | $18.00 |
|---|---|
| Min Order | 1 pieces |
| Availability | In Stock |
| Shipping From | Fujian, China |
| Popularity | 313 people viewed |
After-sales Service:
Within 20-30 Days After Contract Established
Warranty:
1year
Apply to:
Excavator Bulldozer Part Spare
Keyword:
Bulldozer Excavator Track Shoe
Product Description:
Original One-to-One
Color:
Black Yellow
MOQ:
1 Pieces
Name:
Excavator Track Shoe
Video Outgoing-Inspection:
Provided
Product Name:
Track Shoes Excav for
Machine Type:
Excavator Bulldozer
Part Name:
Track Shoes
Technique:
Forging,Casting,Machining,Heat Treatment
Machinery Test Report:
Provided
Trademark:
Doozer
Origin:
Fujian, China
HS Code:
84314990
Product Description
Track Chain /master link / master pin / track pin / track bush / track bolt & nut / Track Link Shoe Assy from Factory Manufacturers For Sale
Product Specifications | ||
Product Name | Bulldozer excavator parts Track Shoe | |
Material | 40Mn/40SiMnTi | |
Finish | Smooth | |
Colors | Black or yellow | |
Technique | Forging casting | |
Surface Hardness | HRC37-49 | |
Pitch | 135mm | |
Warranty time | 2000 hour | |
Certification | ISO9001-9002 | |
MOQ | 1piece | |
FOB Price | FOB Xiamen USD 10-40/Piece | |
Delivery Time | Within 20 days after contract established | |
1. Are you a trade or a manufacure? A: We are an industry and trade integration business, our factory located on Quanzhou Nanan Distric. 2. How can I be sure the excavator parts will fit my excavator? A: Give us correct model number/machine serial number/ any numbers on the parts itself. Or measure the parts give us dimension or drawing. 3. How about the payment terms for bulldozer parts? A: We usually acceptT/T or L/C. other terms also could be negotiated. 4. What is your minimum order for excavator undercarriage parts? A: It depends on what you are buying. Normally, our minimum order is one 20' full container and LCL container (less than a container load) can be acceptable. 5. What is your delivery time for construction machinery parts? A: FOB Xiamen or any Chinese port:25-30days . If there are any parts in stock , our delivery time is only 7-10 days.
6. What about Quality Control? A: We have excellent tester, check every piece to ensure the quality is good, and strict control to ensure product safety into container.
- Similar Products
$30000.00
1 Piece (MOQ)
DBY DCY DFY Series Bevel and Cylindrical Gear Reducer
Jiangyin Gearbox Manufacturing Co., Ltd.
$14.00
50 Pieces (MOQ)
Fits RO Bin Eh12 252-32711-10 Air Cleaner Comp.
Hangzhou Ricman Trading Co., Ltd.