Swipe or use the arrows to view product images.
Zhuding Industrial Electric Leno Bag 4 Shuttle Circular Loom Machine
| Price | $20000.00 |
|---|---|
| Min Order | 1 Set |
| Availability | In Stock |
| Shipping From | Zhejiang, China |
| Popularity | 296 people viewed |
Type:
Shuttle Loom
Voltage:
380V
Computerized:
Non-Computerized
Precision:
Precision
Certification:
CE, ISO9001: 2000
Warranty:
1 Year
Customized:
Non-Customized
Condition:
New
Noise dB (a):
<85
Weight:
2500kg
Dimension(L*W*H):
8500*2200*2700mm
Warranty of Core Components:
1 Year
Width of Draid ( mm ):
700-1200
Marketing Type:
Hot Product 2019
Number of Shuttle:
4
Video Outgoing-Inspection:
Provided
Power:
2.2kw
Capacity ( M/B ) (40 Welts / 100mm):
65-100
Machinery Test Report:
Provided
Power of Machinery( Kw ):
2.2
Rotational Speed of Main Engine(R/Min):
100-150
Most Radia Filaments(Art ):
960
Showroom Location:
None
Trademark:
Zhuding
Transport Package:
Wooden
Origin:
Zhejiang, China
Product Description
Product Description
Performance and Characteristic:
This machine uses material of polypropylene ( pp ) & high density polyethylene ( HDPE ) for producing mesh bagIt was designed and researched on the base of original circular loom , it is the substitute product of present commoncircular loom . It improves whole shuttle , raceway and cam . The best advantage is high production effciency andsmooth weaving flatness . For example : making 14mesh fabric can reach 1.4 m / min , making 13mesh fabric can reach1.6 m / min and making 10 mesh fabric can reach 1 . 85m / min . Our factory supplys the machine for testing . Because ofreasonable desigh , high quality material , it's spare parts consumption is lower than normal circular loom , also the lifeof the runway can reach 10 years.We can improve the normal four-shuttle circular loom capacity through changing some parts.
Type | Number shuttles | Width of draid ( mm ) | Most radia filamentsart ) | Rotational Speed of main enginer/min | Power of machinery( kw ) | Capacity ( m/b ) 40 welts / 100mm | Noise DB A | Weight(kg) |
ZD-YZJI-4/1200B | 4 | 700-1200 | 960 | 100-150 | 2.2 | 65-100 | 85 | 2500 |
ZD-YZJI-4/1500B | 4 | 100-1500 | 1160 | 120-130 | 2.2 | 65-100 | 65 | 2800 |
ZD-YZJI-4/1700B | 4 | 1200-1700 | 1360 | 120-130 | 3 | 45-65 | 85 | 3000 |
Main Products
Company Information
Shipping & Packaging
FAQ
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor
etc.Prepared)
2. How many days will you finish installing ?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine have one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
6. How could you do after one year warranty period?
We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
9. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor
etc.Prepared)
2. How many days will you finish installing ?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine have one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
6. How could you do after one year warranty period?
We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
9. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
Contact Us
- Similar Products
$11000.00
4 Pieces (MOQ)
Textile Velvet Weaving Water Jet Loom Machine for Sale
Qingdao Haifu Machinery Manufacture Co., Ltd.