165kVA Projection Spot Welding Machine Equipment

Price Negotiable Compare
Min Order 1 Piece
Shipping From Guangdong, China
Popularity 358 people viewed
Quantity
+-
 

Heron Intelligent Equipment Co., Ltd.

VIP   Audited Supplier 10 years
Profile Certified by SGS/BV
DB-165-AA001B
Water Cooling
Manual
Vertical
Projection Welding
Ntermediate Frequency Inverter Welder
165kVA
380V/50Hz/3phase
100A
20%
13V
541mm
265
10000 N/0.5MPa
12 L/Min
30000A
HERON
Wooden Case
CE
Guangzhou, China
85152199
Product Description
165KVA Mfdc Projection  Spot Welding Machine Equipment
 
Dimension
L*W*H1150*814.17*1940mm

Welding machine parameter
Rated capacity165KVA
Power supply380V/ 50Hz / 3 Phase
Primary current100A
Rated duty cycle20%
Secondary empty voltage13V
Throat depth541mm
Max working pressure 10000N/0.5MP
Max short circuit current30000A










 
Heron own over 56,000 square meters property; developed MFDC welding system, Capacitor discharge welding system, three-phase DC welding system; single phase AC welding system; offer a complete range of standard resistance welding equipments; and customize automation resistance welding production system with fixture; pursue high welding technology researching and developing all the time.
 
Company Brief
Founded in 1997.
Registered capital is 48 million RMB , about 350 employees.
R&D on a wide range of Resistance Welding Machines and Production Lines.
Continuous Innovation.
Green Manufacturing.







Why choose us?
1. Foundation: Founded in 1997.
2. Company Scale: Registered capital: 48.5765 million RMB, about 400 employees.
3. Business Scope: Professional manufactures whole series of resistance welding machines and completed metal connection intelligent equipment.
4. Enterprise Features: Continuous Innovation
5. Management Philosophy: People-oriented; Green manufacturing.
6. Certification: ISO9001, CCC, CE certification.
7. Application Industries: Automobile and auto parts, motor and generator, low-voltage electrical industry, compressor, household appliance and hardware Industry, BTM-L-Loc system and so on.









FAQ
1.What's the trade terms?
A: FOB, EX-Work, CRF

2.What's the payment term?
A: a. T/T 30% as deposit, 70% should be paid before delivery.
   b. L/C at sight

3. What's the delivery time?
A: 2-3 months after received 30% deposit.

4. What's the package way?
A: Wooden case

5. Which shipment port?
A: Guangzhou or Huangpu

6.How long is the guarantee?
A: For one year after customer received the machine. (It's not including the comsumables)





Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA