liying-1013
One Year
One Year
351-500W
48V
Lead-Acid
14"
Brush
Steel
CE, EEC, EN15194, ISO, CQC, EPA, COC, DOT
Unfolded
20-40km/h
31-60km
14*2.75 Vacuum Tire
JUARA
85% SKD Package
Battery Voltage 48V
China
8711600010
Product Description
| Model NO. | liying-1013 |
| Battery Type | Lead-Acid |
| Motor | Brush |
| Certification | CE, EN15194, ISO, CQC, COC |
| Max Speed | 41-60km/h |
| Battery | Chaowei/Tianneng |
| Tire | 14*2.75 Vacuum Tire |
| Transport Package | 85% SKD Package |
| Trademark | JUARA |
| HS Code | 8711600010 |
| Battery Voltage | 48V |
| Wheel Size | 14" |
| Frame Material | Unfolded |
| Range per Power | 31-60km |
| Battery Capacity | 48V/12ah or 48V/20ah |
| Basket | Steel Basket |
| Specification | 14" |
| Origin | China |
| Production Capacity | 3000/Month |
14'' vacumm tire 500w motor power electric bike '






| frame | high carbon steel |
| speed | 3 level variable speed |
| brake | drum brake |
| motor power | 500W |
| remote | 2pcs |
| controller | big six tube |
| logo | juara or customized |
| basket/rear mirror | yes have |

Xingtai Weilian Bicycle Co., Ltd. was established in Xingtai, Hebei province. Dedicated to the production, development, manufacture and sale of bicycle products has a history of more than 20 years. We are a manufacturer specializing in the production and export of bicycles, we accept a variety of customized services with sufficient experience. Our company has an innovative team aimed at production development and quality control. we are professional !









1. Q: Where is your company located? How can I visit there?
A: Our factory is located in Pingxiang County, Xingtai City, Hebei Province, China. Welcome to visit us.
2. Q: Can I get sample and how long will it take?
A: Yes. We can supply sample. And you need to pay for the sample and courier. About 7days after receiving the payment, we will send it out.
3. Q: Can I have my own customized product?
A: Yes. Your customized requirements for color, logo, design, package, carton mark, your language manual etc. are very welcome.
4. Q: Can I mix different models in one container?
A: Yes. Different models can be mixed in one container.
5. Q: What's the delivery time?
A: It will take about 20-30 days to finish an order. But the exact time is according to actual situation.
6. Q: What is the payment terms?
A: T/T, L/C at sight
7. Q: How does your factory carry out quality control?
A: We attach great importance to quality control.Every part of our products has its own QC.







Audited Supplier










