300times Reusable Formwork System/ Aluminium Concrete Forming System

Price $120.00 Compare
Min Order 100 Square Meters
Availability In Stock
Shipping From Guangdong, China
Popularity 258 people viewed
Quantity
+-
 

Kitsen Technologies Co., Ltd.

VIP   Audited Supplier 8 years
Profile Certified by SGS/BV
forming system
ISO
Aluminum Alloy
Wall Formwork
KITSEN
Pallet
Variety of sizes according to project drawing
China
Product Description
Product Description:

Cost effective aluminum formwork is the result of years of efforts. KITSEN has consistently dedicated to products researching, developing and testing. It allows for monolithic pouring of all walls, slabs and stair cases to suit any housing project. Early striking aluminum formwork's  inherent simplicity is what makes the KITSEN EasyForm an efficient, safe and cost effective alternative to extremely heavy steel forms. It can be either fully built by hands or,after being completely assembled, with cranes. 
Comparing to timber forms, KITSEN easyform can increase the jobsite efficiency by 1 /3 to 1 /2.

 
Product Parameters:
 
Product NameKitsen Aluminum formwork(EasyForm)
Material Aluminum 6061-T6
Sizeariety of sizes according to project drawing
 
Advantages

Easy to handle

-Kitsen Easyform is manufactured with aluminum alloy and every extrusion is specifically designed for high strength and light weight. Even for the biggest panel, it can be easily handled by a single worker.
 
One -time Pouring

-Kitsen Easyform allows for monolithic pouring of all walls, slabs and staircases to suit any housing projects.
 
High Concrete Pouring Rate

-Early Stripping Theory is perfectly integrated with Kitsen EasyForm System. With one-floor forms and three-floor props, the workers will be able to complete the concrete pouring job of one floor in only 4 days.

More Reuses

-Typical number of reuses is likely to be≥300 times subject to the correct site practice.

Great Recyclable Value

-The used aluminum material is of great recyclable value, over 35% higher than steel.


 
Product Assembly Description:
  1. Check that all components are on site, undamaged and that they are functioning correctly - (refer to Checklist and Quantity Schedules). Damaged or incorrect components shall not be used.Make sure the panel is clean before assembly.Handle panels with care during transit.  Avoid bumping and collision.Do not climb panels.

Company Profile



  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$100.00 1000 Pieces(MOQ)

Heavy Duty Shoring Prop Scaffold System to Support Concrete Slab

Kitsen Technologies Co., Ltd.
$210.00 1000 Square Meters(MOQ)

Modular Pannels Aluminium Shuttering Formwork System

Kitsen Technologies Co., Ltd.
$122.00 100 Square Meters(MOQ)

Construction Concrete Aluminum Formwork Lightweight Durable Forming System for Slab Column Wall

Kitsen Technologies Co., Ltd.
$23.00 100 Pieces(MOQ)

Steel / Aluminum Layher Scaffold Ringlock Scaffolding System Modular Platform Factory Direct

Kitsen Technologies Co., Ltd.
$9.00 200 Pieces(MOQ)

China H20 Beam Concrete Climbing Scaffolding Formwork Factory

Linyi Consmos Wood Industry Co., Ltd.
$1010.00 5 Tons(MOQ)

Aluminum/Steel Formwork with Bamboo Plywood Used for Concrete Pouring of Building Construction Concrete Building Steel Formwork

Sichuan Taishenglan Technology Co., Ltd
$0.90 10 Pieces(MOQ)

Panel Lock Rapid Clamp for Formwork Rebar

Cangzhou JDG Scaffolding Co., Ltd.
$1.00 300 Square Meters(MOQ)

Durable Wall Form and Column Form

HORIZON FORMWORK CO., LTD.
$6.00 2000 Meters(MOQ)

Zulin High Bearing Capacity Timber Beam H20

Beijing Zulin Formwork & Scaffolding Co., Ltd
$1600.00 120 Tons(MOQ)

Customized Hydraulic Intelligent Steel Bridge Box Girder Concrete Mould Formwork

Hunan Wuxin Intelligence Technology Co., Ltd.