300times Reusable Formwork System/ Aluminium Concrete Forming System

Price $120.00 Compare
Min Order 100 Square Meters
Availability In Stock
Shipping From Guangdong, China
Popularity 262 people viewed
Quantity
+-
 

Kitsen Technologies Co., Ltd.

VIP   Audited Supplier 8 years
Profile Certified by SGS/BV
forming system
ISO
Aluminum Alloy
Wall Formwork
KITSEN
Pallet
Variety of sizes according to project drawing
China
Product Description
Product Description:

Cost effective aluminum formwork is the result of years of efforts. KITSEN has consistently dedicated to products researching, developing and testing. It allows for monolithic pouring of all walls, slabs and stair cases to suit any housing project. Early striking aluminum formwork's  inherent simplicity is what makes the KITSEN EasyForm an efficient, safe and cost effective alternative to extremely heavy steel forms. It can be either fully built by hands or,after being completely assembled, with cranes. 
Comparing to timber forms, KITSEN easyform can increase the jobsite efficiency by 1 /3 to 1 /2.

 
Product Parameters:
 
Product NameKitsen Aluminum formwork(EasyForm)
Material Aluminum 6061-T6
Sizeariety of sizes according to project drawing
 
Advantages

Easy to handle

-Kitsen Easyform is manufactured with aluminum alloy and every extrusion is specifically designed for high strength and light weight. Even for the biggest panel, it can be easily handled by a single worker.
 
One -time Pouring

-Kitsen Easyform allows for monolithic pouring of all walls, slabs and staircases to suit any housing projects.
 
High Concrete Pouring Rate

-Early Stripping Theory is perfectly integrated with Kitsen EasyForm System. With one-floor forms and three-floor props, the workers will be able to complete the concrete pouring job of one floor in only 4 days.

More Reuses

-Typical number of reuses is likely to be≥300 times subject to the correct site practice.

Great Recyclable Value

-The used aluminum material is of great recyclable value, over 35% higher than steel.


 
Product Assembly Description:
  1. Check that all components are on site, undamaged and that they are functioning correctly - (refer to Checklist and Quantity Schedules). Damaged or incorrect components shall not be used.Make sure the panel is clean before assembly.Handle panels with care during transit.  Avoid bumping and collision.Do not climb panels.

Company Profile



  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$70.00 1000 Pieces(MOQ)

Highly Extra Safety and Efficient Floor-Slab Table Formwork System

Kitsen Technologies Co., Ltd.
$900.00 300 Sets(MOQ)

Custom Height 6061-T6 Aluminum Scaffolding Tower Scaffolding System with TUV Safety Certification

Kitsen Technologies Co., Ltd.
$300.00 10 Sets(MOQ)

Flexible Folding Portable and Mobile Scaffolding Working Platform Frame System in China

Kitsen Technologies Co., Ltd.
$350.00 300 Meters(MOQ)

Peri-Inspired Skydeck Slab Formwork Concrete Formwork with Aluminum Props for Building Construction

Kitsen Technologies Co., Ltd.
$800.00 400 Square Meters(MOQ)

Formwork Aluminium for High-Rise Building

TANGSHAN XINGHE TRADE CO., LTD.
$9.00 200 Pieces(MOQ)

China H20 Beam Concrete Climbing Scaffolding Formwork Factory

Linyi Consmos Wood Industry Co., Ltd.
$158.00 1 Piece(MOQ)

Bridge Construction Accessories Hot DIP Galvanized Steel Beam System Aluminium Aluform Beam Steel Beam Beam Aluminium Beam Formwork System

Taishan Dongkuo Steel Structure Co., Ltd.
$1050.00 1 Ton(MOQ)

High-Strength Large Infrastructure Steel Formwork

Beijing Aoyu template Co., Ltd.
$70.00 10 pieces(MOQ)

European Standard Size Loaf Magnets for Precast Concrete

Ningbo Wewin Magnet Co., Ltd.
$35.70 200 Pieces(MOQ)

Easy Concrete Recycling System Wall Formwork Price PP Board PVC Plastic Formworks

Henan Lanke Plastic Profiles Co., Ltd.