1. Introduction of Hotel / Barbecue / Restaurant / Ginshop Beer Brewing Equipment
300L/500L/1000L/2000L beer brewery equipment is a good choice for ginshop, barbecue, restaurant who brew beer for customer at scene.
Small floor coverage makes it possible to show constomers the whole process of beer brewing.
The luxury and sanitary process comforts the constomers and give them impressed experience.

2. Configuration list of 300L Beer brewery equipment
300L brewery equipment | |||
System | Components | Capacity | Specification |
Grinding System | Miller | 100-150KG/H | Double Roller,Noise<60db |
Heating System | Boiler | 50KG/H | Electric,Gas with CE certification |
Brewhouse System | Mash/Lauter tun | 300L | Material: SUS304/Red copper Interior thickness:3-4mm Exterior thickness:2-3mm Insulation: Polyurethane thickness: 80mm |
Brew Kettle/ Whirlpool Tank | 300L | ||
Hot Water Tank | 500L | ||
plate exchanger | 3M2 | SUS304 | |
Yeast adding tank | 3L | SUS304 | |
Wort Pump | Food grade centrifugal pump. | ||
Working platform | SUS304 | ||
Fermenter System | Fermentation Tank | 300L/600L | Top manway/Side manway Drying hop port Double wallet with dimple cooling jacket Carbonation port to fill CO2 |
Cooling System | Glycol Water tank | 800L | With PU level indicator |
Chiller | 3HP | ||
Pump | |||
Cleaning System | Disinfection Tank | 50L | SUS304 |
Alkali Tank | 50L | ||
Pump | |||
Control System | Control Cabinet | PID/PLC/HMI | Manual/Semi-automatic/Automatic |
Optional | Auger System | ||
Grain Case | |||
Customized |
1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.

2. Professional engineers going abroad for the installation ,debugging, and training, all the travelling cost and
locate food, and hotel shall be afforded by the buyer
3. The installation period is about 15 days including assembling brewing tanks and training the operator. It is
free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended
installation.
4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method
available to the customer.
5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc. should
be installed separately. If needed, cost calculate additionally.
6. Brewing technology, brewing formula, can be offered available
7. More spare parts are available to offered freely.