Adjustable Steel Formwork for Structural Columns

Price $1050.00 Compare
Min Order 1 Ton
Availability In Stock
Shipping From Beijing, China
Popularity 353 people viewed
Quantity
+-
 

Beijing Aoyu template Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
Column template
Yes
One Year
ISO
Steel
Column Formwork
Yes
Customized
Customized
Container
Aoyu
7308900000
Product Description
Basic Info.
Model NO.AY86,AY106,AY126,MaterialSteel Wood
TypePier pillar formworkSpecificationQ235B
Panel thickness6mmWidth500-6000mm
Maxmum lateral pressure80 kn/square meterHeight2000mm
Guardrail height1200mmAppliation scopeRoads,Railways,Water conservancy
Number of Platform2m/layerWidth of Operating Platform900mm
Transport PackagePackage Box, Steel Pallet, Steel Frame, ContainerBrandAoyu
OriginChinaProduction Capacity14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork is renowned for its strength and durability, making it a reusable solution for numerous construction projects. This formwork is designed for easy assembly and erection, ensuring efficiency on site. With a fixed shape and structure, it is particularly ideal for projects requiring repetitive shapes such as high-rise buildings, roads, bridges, and more.
 

Packaging:

1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, and this must be confirmed prior to loading.
2. Various packaging methods are employed for different products:
---Bundles: Suitable for items like timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Irregular goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container order, we typically require 20-30 days after receiving the customer's down payment.
2. Transportation: The duration depends on the destination port.
3. Special requirements may necessitate further negotiation.

FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two of our own factories.

Q2: What do you specialize in?
A: We design and manufacture formwork products specifically forbridges and tunnels.

Q3: What services do you offer?
A: We provide our clients, including project owners, design institutes, or contractors, with expert suggestions, formwork layout drawings, and detailed quotations.
B: We sell our top-quality products to contractors, building companies, material suppliers, and trading firms.
C: We also support our global peers by supplying them with our superior formwork products.

Q4: How long does it take to create a brief design and quote after receiving the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after the contract is signed?
A: Typically, it takes 30~60 days, depending on the type and quantity of the products to be produced.

Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$1050.00 1 Ton(MOQ)

Aoyu Formwork System for Building Bridges

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

High-Strength Large Infrastructure Steel Formwork

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

Bridge Formwork Template by Aoyu Engineering

Beijing Aoyu template Co., Ltd.
$1050.00 1 Ton(MOQ)

Durable Steel Formwork System for Efficient Construction Projects

Beijing Aoyu template Co., Ltd.
Negotiable 300 Square Meters(MOQ)

Timber Beam Column and Wall Formwork for Building Construction

HORIZON FORMWORK CO., LTD.
Negotiable 500 Square Meters(MOQ)

Steel Slab Formwork GF Pallet Hot Sale Easy Set up

Qingdao Scaffolding Import and Export Co., Ltd.
$4.00 400 Pieces(MOQ)

Hot Sales Plastic Paver Interlocking Mold Plastic Injection Mold

Jiaxing Wangzu Industrial Co., Ltd.
$0.25 1000 Pieces(MOQ)

Concrete Formwork Snap Tie with Plastic Cone for Plywood

WUXI TOTAL CONTEC METAL INDUSTRIES CO.,LTD
$0.90 10 Pieces(MOQ)

Panel Lock Rapid Clamp for Formwork Rebar

Cangzhou JDG Scaffolding Co., Ltd.
Negotiable 100 Pieces(MOQ)

Formwork Foundation Plate, Foundation Panel, Concrete Panel Slab

Rizhao Wellfit Scafform Co., Ltd