
A massive air-supported structure has been deployed at this construction site, showcasing highly effective dust and noise control measures. Recently, the Phase II project of Shenzhen Eye Hospital, undertaken by China Construction Northern Construction Engineering Co., Ltd., successfully implemented the air-supported membrane technology for foundation pits.

Co., Ltd. is a technology-based building and environmental
protect ion enterprise under the Baikal Group, integrat ing
environmental engineering research and development, design, construction, production and processing, sales, and operation
management. The company is engaged in steel film structures and airinflated membrane structure; Fully enclosed and environmentally
friendly storage; The environmental protection, design, processing, and construction general contracting business of the dust control
main project





Cer t i f icate for Membrane St ructure Engineer ing, Level 2
Construction Qualification for Construction Engineering, Level 2
General Contracting Certificate for Mechanical and Electrical
Engineering Construction, Level 2 Professional Contracting
Certificate for Fire Protection Facilities Engineering, and Level 2
Professional Contracting Certificate for Building Decoration
Engineering. It has passed the ISO four system certification and has
been awarded the honorary titles of National High tech Enterprise
and Zhongguancun High tech Enterprise. The company has long adhered to the business philosophy
of "quality, integrity, technology, and environmental protection" and continuously increased investment in technological research and
development. The company has a united and innovative team of
management, research and development, design, production, and
technical service talents, including 6 professor level technical
consultants, 12 with senior professional titles, 35 with intermediate
professional titles, and 40% of the total employees are young
professional and technical personnel with a bachelor's degree or
above.


