Aluminium Bimetallic Parallel Groove Connector

Price $5.00 Compare
Min Order 2 Pieces
Availability In Stock
Shipping From Tianjin, China
Popularity 911 people viewed
Quantity
+-
 

Epicor Power Technology Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
  • Tianjin, China
  • Dave (Mr.)  
    Manager
custom
Welding
Non-GB
Substation Fittings
Pull-Line Fitting
0.1kg
100%
100
Epicor Power
Epicor Power
Buyer's Requirement
DIN, ISO, GB, ANSI
China
Product Description



CAPG Cu-Al Parallel Groove Connector is used for the Non-bearing connection and offset of aluminum stranded wire, aluminum stranded wire, it's used with insulating cover for the effect of protective and insulation.
 
TypeConductor cross section(mm2)Bolt
CAPG-A1Cu 6-50 Al 16-701xM8x40
CAPG-A2 Cu 10-95 Al 25-1501xM8x45
 
CAPG-B1 Cu6-50  Al 16-702xM8x45
CAPG-B2Cu 10-95  Al 25-1502xM8x50
CAPG-B3Cu 25-185   Al 35-2002xM10x60

 

CAPG-C1Cu6-50   Al 16-703xM8x45
CAPG-C2Cu10-95   Al 25-1503xM8x50
CAPG-C3 Cu25-185   Al 35-2403xM10x60
CAPG-C4Cu35-240   Al 35-3003xM10x70

Q1. Can I have a sample order for this product?
A: Yes, we welcome sample orders to test and check quality. Mixed samples are acceptable.

Q2. How do you ship the goods and how long does it take to arrive?
A: We usually ship by air or ocean shipping,  It usually takes 10-30 days to arrive. For sample or small orders use DHL, UPS, FedEx, or TNT. It usually takes 3-5 days to arrive. 

Q3. Do you have certificate for raw materials?
A: We build long-term relationship cooperation with qualified ISO9001 ROHS raw material suppliers

Q4. Do you offer OEM Service? 
A:We accept OEM, and ODM. The product size and material are customized. Our own logo and own design are welcome. We will produce according to your requirements and description.

Q5. Do you offer a guarantee for the products?
A: Yes, we offer 1-2 years warranty on our formal products.

Q6. What is your Payment terms?
A: For large orders: T/T LIC
  For small orders: T/T Western Union and Paypal are acceptable

Q7. What about delivery time?
A: 1) Samples: within one week.
    2) Goods: 15-25 days usually.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$5.00 2 Pieces(MOQ)

Forged Steel Hot DIP Galvanized Common Ball Hook

Epicor Power Technology Co., Ltd.
$5.00 2 Pieces(MOQ)

Carbon Steel Square Nut Nasteners for Wood

Epicor Power Technology Co., Ltd.
$5.00 2 Pieces(MOQ)

Good Manufacturer Power Line Hardware for Electric Power Link Fitting

Epicor Power Technology Co., Ltd.
$5.00 2 Pieces(MOQ)

Nx Type Wedge Type Guy Wire Clamp

Epicor Power Technology Co., Ltd.
$1.00 1 Piece(MOQ)

Overhead Transmission Line Xgh Aluminum Alloy Suspension Clamp for Electric Wire

Hebei Leicheng Power Technology Co., Ltd.
Negotiable 500 Pieces(MOQ)

One Yard Cable Tightener Middle Terminal Top Cable Fixed Locking Device

Zhejiang Jiayi Power Technology Co., Ltd
$28.00 200 Pieces(MOQ)

600g Galvanized U Channel Electrical Cross Arm with Holes

Tangshan Victory Trading Co., Ltd
$3.45 50 Pieces(MOQ)

The Torque Coupling Tube Tightener Secures The Locking Grounding Device Terminal Wire Nose Fittings

Zhejiang Jiayi Power Technology Co., Ltd
$0.60 500 Pieces(MOQ)

Flexible Copper Cable Gripper for Hanging Kits

Dongguan Yuyang Hardware Co., Ltd.
$5.00 2 Pieces(MOQ)

Overhead Galvanized Aluminium Alloy Strain Pole Clamp Suspension Clamp

Epicor Power Technology Co., Ltd.