

Low maintenance; Suitable for tropical area
* Double Layers Glass Door
Self-closing; Safety tempered glass
* Fan Dynamic Cooling
Fast cooling. Cooling Speed: Dynamic > Fan assisted > Static cooling
* Digital Temperature controller
With LED readout for inside temperature and automatic defrost timer
Original design. The best cooler light ever to save your service cost and boost impulse sales
* Universal Casters with Lock
Easy move and stop anywhere
* Heavy Duty Shelves
Adjustable for merchandising; 30 kg Load endurance / shelf
* Extruded Curve Handle
Could be accessed from either side, suitable for left or right-handed
Optional:Metal Handle

Model No | VD-650 | VD-850 | VD-1000 | VD-1250 | VD-1450 |
Gross volume (L) | 640L / 22.6cuft | 816L / 28.8cuft | 970L / 34.3cuft | 1200L / 42.4cuft | 1428L / 50.5cuft |
Outer size (L×W×H)(mm) | 1000×560×1985 | 1110×650×2010 | 1110×750×2010 | 1375×750×2010 | 1375×850×2010 |
Packing size (L×W×H)(mm) | 1040×590×2040 | 1150×680×2100 | 1150×780×2100 | 1415×780×2100 | 1420×890×2100 |
Loading Qty(20/40/40HQ) | 20/41/41 | 17/34/34 | 15/30/30 | 12/24/24 | 10/21/21 |
Temp. Control | Digital controller | ||||
Temp. Range | 0ºC~10ºC | ||||
Refrigeratant | R290a | ||||
Evaporator type | Fin type evaporator | ||||
Con type | Steel wire type condenser | ||||
glass door | Front toughened 2 pane glazing, self-closing with stopper | ||||
Interior Light | 2 vertical tube light | ||||
shelf (qty) | 8pcs(4×2) |
Apex Refrigeration Equipment Limited
FAQ
Q1:I haven't heard of R290, R600A, or R513A refrigerant before. What is it?
1. R290 (Also known as high purity propane or care 40) and
3. R513A(Also known as option XP10) is an HFO(Hydrofluoroolefin) refrigerant.
They are being used as an ECO-friendly refrigerant by some manufacturers in response to the significant new alternatives
policy(SNAP) program. Read more about this program in our blog post on refrigerant regulations.
Q2: What is your means and terms of payment?
We accept payment from T/T, L/C, Westunion. Moneygram, Credict card etc.
Our payment term is 30% deposit in advance and balance before shipping.
Q3: What is your production lead time?
A. 2 days for sample (ready in stock);
B. 15 days for sample (without stock);
C. 25 ~ 50 days for mass production,determined by different models and order QTY.
Production time will be a bit longer during the Chinese new year holiday (normally from December to February)
Q4: Do you provide sample? Is it free?
Sample is available upon your sampling order with charge. The sampling time is 15 days. On top of normal product cost, we may charge additional sampling cost and packing cost , but such cost is refundable once you place massive orders.
Q5: Where is your nearest Loading Ports?
Guangzhou, Shunde, Nansha, Shenzhen We're arranging shipments around the world every day.
To save time and cost, you could just send us your final address or port name, and we will check the freight cost for you.