| Shipping Port | Dalian Port (2.6km close to our plant) | 
|   R&D | Softward: Solidworks, CAD,  Procast,  UG, Pro-E etc. | 
| Development cycle of samples: 7-25 days | 
| Materials | 1) Aluminum: AL 6061-T6, 6063, 7075-T etc. | 
| 2) Stainless steel: EN1.4301,(SUS304)EN1.4436,SS2343,EN 1.4462,EN 1.4404,EN1.4410, etc. | 
| 3) Steel: EN10025 etc. | 
| 4) Titanium: ASTM B348 GR2,B367 C-3/B381 F-3,B265 G2 etc. | 
|   | 5) Forging/casting steel | 
| Machining | Max dimension :630mm for diameter or length 6000mm | 
| 3/4/5 Axis CNC,milling, turning, auto-lathe turning | 
| Surface Roughness Ra 0.1~3.2 | 
| Short Blasting, Painting equipment | 
| Heat treatment | Normalzing, Tempering, Quenching, Annealing,  Quenching & Tempering, Caburization,    | 
| Surface treatment | Polishing, Sand blasting, zinc plating     | 
| Electro-polising, mirror polishing, Brush polishing, Powder coating, etc | 
| Inspection | Cleanliness inspection, X-Ray radiographic inspection, Visal Inspection | 
| Measuring  | CMM inspection,Roughness tester,Image measuring instrument, Thread gauge, Smooth plug gauge | 
| Quality Control | IATF 16949&ISO 9001 | 
| Transport Package | PE bag ,Paper /Wooden Case | 
| Application Aera | Auto/Medical/Electronic//Aircraft/Semiconductor Testing Equipment |