
Arrival and Unloading
Stunning : Common stunning methods include electrical stunning, controlled atmosphere stunning, or water bath stunning.
Bleeding :This step is crucial for ensuring the quality and safety of the meat.
Scalding and Feather Removal: The chickens are then transported to a scalding tank filled with hot water, and plucker machine clean feathers.
Evisceration: Following feather removal, the chickens are taken to an evisceration line.
Washing and Chilling: The eviscerated chickens are thoroughly washed to remove any remaining debris or bacteria. This is typically achieved using cold water or refrigeration systems.
Quality Control and Packaging: After chilling, the chickens undergo quality control inspections to ensure they meet food safety standards. If approved, they are packaged for distribution.


1. Crate washing processing
2.Slaughter processing
3.Evisceration processing
4.Pre chilling processing
5.Cutting up processing
6.Packing processing
We manufacture of slaughter machine with more than 40 years .Exported over 20 years.More than 800 projects around the world.
Yuechen equipment one-stop slaughter machine intelligent soulation supplier!



Type of birds | Chicken |
Capacity | Speed adjustable 100-10000BPH |
Live chicken weight | 2KG |
Finished products | Whole chicken |
Stunning | Included |
Killing | manual |
Bleeding time | 4 minutes |
Scalding time | 90 seconds |
Heat supply | Electric heating |
Scalding temperature | 52-61ºC, depending on the chicken data |
Evisceration | Manual on line |
Pre-chilling | Water bath chilling |
Giblet processing | Customzation |
Cutting process | Customzation |
Packing process | Customzation |
Power/Motor | 380V 3P 50Hz or Customized |


Mechanical Production:
Design and Engineering: This involves creating detailed drawings, specifications, and calculations for the mechanical system or product.
Material Procurement: Acquire the necessary raw materials, components, and parts required for manufacturing.
Manufacturing: Use the acquired materials to fabricate and assemble the mechanical system or product according to the design specifications.
Quality Control: Implement quality control measures throughout the production process to ensure adherence to standards and specifications.
Inspection:
Pre-shipment Inspection: Conduct a thorough inspection of the manufactured mechanical system or product to verify its quality, functionality, and compliance with design specifications before shipment.
Debugging:
Identify and rectify any issues or malfunctions discovered during the inspection phase.
Delivery:
By air /road/train/sea send container
Installation:
Site Preparation: Prepare the installation site by ensuring it meets the necessary requirement
Equipment Setup: Install and assemble the mechanical system or product at the designated site according to the installation instructions and specifications.
Testing and Commissioning: Conduct thorough testing and commissioning procedures to verify the proper functioning and performance of the installed mechanical system.
After-Sales Support:
Warranty and Service: Provide warranty coverage and support services to address any issues or maintenance requirements that may arise after installation.
Customer Support!


We have 40years history .more than 30engineering and technical personal ,Various production and testing equipment readily available .The company passed ISO9001, SGS,SONCAP,CE certification, product quality has been unanimously recognized.
We always adhere to the people-oriented scientific and technological innovation to meet customer needs, quality service as the basis, mutual win-win as the goal!

Professional poultry slaughter manufacturer since 1980.