Black Steel ASTM/ API 5L Gr. B Carbon Seamless Steel Pipe

Price $490.00 Compare
Min Order 5 Tons
Availability In Stock
Shipping From Sichuan, China
Popularity 293 people viewed
Quantity
+-
 

Chengdu Derbo Steel Co., Ltd

VIP   Audited Supplier 16 years
Profile Certified by SGS/BV
Hot Rolled A53 Gr. B
Seamless
Hot Rolled
Carbon Steel
Black
Pipeline Transport, Oil/Gas Drilling, Chemical Industry
Round
10#-45#, A53-A369, Q195-Q345, St35-St52, 20#, A106
1.24 - 59.54 mm
10.3 - 1219 mm
Lasw, Hot Rolled, ERW, SSAW, etc
in Bundles or Per Customer's Requirements
15~60 Days Acc. to Order Quantity
DERBO
in Hexagonal Bundle with Steel Strip / Per Require
OD: 10.3 - 1219 mm, THk: 1.24 - 59.54 mm
Hebei, China (Mainland)
7304199000
Product Description
Product Parameters

Name

Seamless Carbon Steel Pipe
Size

Diameter: 1/2''-28''/ 21.3-711mm 

Thickness: 3.0--45mm

Length: As your requirement.

StandardAPI 5L; GB/T8163,ASTM A106, ASTM A53,DIN1629,BS3095,JIS G 3454 
Material GradeGr.B,20#,ST37,ST37-2,ST37-3,320,STPG370 etc.
Other Manufacturing Process ERW,LSAW/SSAW
Main ApplicationPipeline transportation systems of petroleum and natural gas industries.
Min quantity5 tons, more quantity price will be lower.
packingExternal Black painting, both sides with end caps, in bundles by steel strips, covered by waterproof. Or as your requirement.
Delivery time20-25days after receiving your deposit or L/C.
PaymentTT or 100% Irrevocable LC at sight. We can discuss.

 

Detailed Photos

Packaging & Shipping

Customer inspection

Inspection and certification

Customer visits

FAQ

Q:What is the material of your products?
A:Our company is specialized in carbon products and metal products,we also can choose material as customer's requirement.
 
Q:What about your standard delivery date?
A:Normally the delivery time is 7-25 days .For some special case,we can make it within two weeks
 
Q:Is there any discount?
A:Sure,different quantity will have different discount.
 
Q: Can I Have Samples?
A:Yes, we can make samples to you,please contact us for details.

Chengdu Derbo Steel Co., Ltd focus on pipe&tube solution for project application for more than 10 years with good quality and reasonable price,has succeed to cooperated with Shell,Lukoil and other famous oil&gas companies all over the world.


  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$650.00 10 Tons(MOQ)

8 5/8 Inch 36ppf N80 L80 Carbon Steel Casing Tubing Pipe

Chengdu Derbo Steel Co., Ltd
$700.00 1 Piece(MOQ)

Customized Size for Galvanized Corrugated Steel Metal Culvert Pipe

Chengdu Derbo Steel Co., Ltd
$700.00 1 Ton(MOQ)

Black Pipe Suppliers ERW Carbon Steel API 5L A106 Seamless Steel Pipe

Chengdu Derbo Steel Co., Ltd
$500.00 1 Ton(MOQ)

ASTM A179 A192 Carbon Steel Seamless Tube for Boiler and Heat Exchanger

Chengdu Derbo Steel Co., Ltd
$400.00 5 Tons(MOQ)

20X20 25X25 40X40 50X50 60X60 20X40 30X50 40X60 150X150 Galvanized Steel Square/Rectangular Pipe

Xi'an Dongmeng Steel Co., Ltd
$25.20 120 Meters(MOQ)

Uns S31254 Alloy 254 6 High Moly Seamless Tube Corrosion Resistance and Strong Weldability for Offshore Platforms Petrochemicals Seawater Pipelines

SHANGHAI NAI LOK INDUSTRIAL CO., LTD.
Negotiable 1 (MOQ)

Seamless Stainless Steel Pipe (TP321)

Wenzhou Jiangnan Steel Pipe Manufacturing Co., Ltd.
$1300.00 1 Ton(MOQ)

API 5CT-J55/K55-Casing Carbon Steel Seamless Tubing Nu/EU-Oil Gas Field/Casing

Tianjin Tiancheng Import and Export Co., Ltd.
$600.00 20 metric tons(MOQ)

High-Quality Welded Steel Tubes for Construction and Industrial Use

Credit Import and Export Trading Co., Ltd.
$0.54 1 kg(MOQ)

S275/S355/X52/X65/X70 Carbon Steel Dsaw/ LSAW Offshore Welded Pipe for Marine Construction

Permanent Steel Manufacturing Co., Ltd.