Brass Trigger Shattaf / Bidet Spray Shower Set, Matt Black

Price $15.22 Compare
Min Order 1000 Pieces
Availability In Stock
Shipping From Zhejiang, China
Popularity 872 people viewed
Quantity
+-
 

Ningbo Runner Sanitary Ware Co., Ltd.

VIP   Audited Supplier 19 years
Profile Certified by SGS/BV
  • Zhejiang, China
  • Stephen (Mr.)  
    Sales Manager
S01-267A
Hand Shower
Chrome
ABS Plastic
Massage
Hand Shower
Round
3
Ruina
Export Packing
iso9001
Zhejiang, China
8481809000
Product Description

Dear Friends,

Thanks for visiting our product page.

Any interests or more details,  please click here  to contact us.
Your message will be answered within 8 hours.


Product Description
Model No.
S04-3203

Shattaf / Bidet Spray Shower Set, matt black trigger

• Twist free matt black flexible hose 120 cm
• ½" swivel conical matt black connection
• ABS matt black wall bracket


 
Product name
High-Pressure Handheld Bidet Sprayer For Toilet, Modern Bidet Spray Head For Personal Hygiene
Color
  black
Shattaf Material
brass
Hose
stainless steel
Bracket
plastic
MOQ
1000 pcs
Packing
1set/ cloth bag/inner box; many sets/outer carton Can be designed by customer

Company Profile


 

FAQ
 

Q1: When can I get the quotation lf l send an enquiry at your website?
We usually quote or reply within 5 minutes-6 hours after we get your inquiry.

Q2: What is your MOQ? Can we order small amount ?
Usually our MOQ is 1,000pcs.Trial orders and further requests can Be negotiated.

Q3: How can we get a sample to check your quality?
After price confirmation, you can require samples to check our quality. If you need the samples, we will charge for the sample cost. But the sample cost can be refundable after order confirmation when your quantity of the order is more about the MOQ.

Q4: Can you do the design for us?
Yes, we have a professional team with rich experience in manufacturing. We are able to supply customized sizes, grades of material, and coating. We also could supply the package according to your request the sample cost. But the sample cost can be refundable after order confirmation when your quantity of the order is more about the MOQ.

Q5: How long can I expect to get the sample?
After you pay the samples charge and send us confirmed files, the samples will be ready in 1-5 days for the regular specification. Or it will take about 15 days to produce new samples. The samples will be sent to you via express and arrive in 3-5 days. You can use your own express account or prepay us if you don't have an account.

Q6: What is your payment term?
Normally,T/T 30% down payment, 70% balance to be paid before shipment. or  Irrevocable L/C at sight.

Q7: What about the lead time for mass production?
Usually will be around 30~35days.

  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$9.00 2000 Pieces(MOQ)

Brass Safety Valve for Electric Water Heater (V21-018)

Ningbo Runner Sanitary Ware Co., Ltd.
$23.00 100 Pieces(MOQ)

Kitchen Sink Mixer with Flexible Spout (KM512)

Ningbo Runner Sanitary Ware Co., Ltd.
$15.00 1000 Pieces(MOQ)

Runner Vanne D′ Arrê T Laiton à Volant/Forged Brass Gate Valve with Steel Handwheel

Ningbo Runner Sanitary Ware Co., Ltd.
$8.55 2000 Pieces(MOQ)

Hose Union Bibcock in Yellow Brass (V26-332)

Ningbo Runner Sanitary Ware Co., Ltd.
$0.99 300 Pieces(MOQ)

Slim Stainless Steel Shower Head with Square Shower Arm

Yuyao Hongli Soft Tube Clean-Utensil Co., Ltd.
$3.08 200 Pieces(MOQ)

Water Saving 3 Mode Wholesale ABS Showerhead Black Shower Head

Xiamen Greenwell Sanitary Ware Co., Ltd.
Negotiable 500 Pieces(MOQ)

Wholesale Bathroom Square Overhead Shower 200*300mm Top Rainfall Shower Head

Ningbo Huanyu Sanitary Ware Co., Ltd.
$5.00 200 Pieces(MOQ)

High Pressure Saving SPA Negative Eco Filtered Adjustable Rainfall Shower Head

Ningbo Huanyu Sanitary Ware Co., Ltd.
$187.00 1 Piece(MOQ)

Swimming Pool SPA Equipments Decoration Fountain Pool Waterfall

GUANGDONG KASDALY POOL SPA EQUIPMENT CO., LTD.
$3.00 300 Pieces(MOQ)

Massage Overhead Rain Shower Head 8inch Bathroom Shower

YUYAO YASS PLUMBING EQUIPMENT FACTORY (GENERAL PARTNERSHIP)