Building Forming Concrete H20 Wooden Beam Table Slab Formwork Scaffolding System

Price $90.00 Compare
Min Order 100 Square Meters
Availability In Stock
Shipping From Jiangsu, China
Popularity 262 people viewed
Quantity
+-
 

YANCHENG LIANGGONG FORMWORK CO., LTD.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
Table Formwork
Remote Service
One Year
ISO9000
Timber Beam, Plywood & Steel Props
Table Formwork
Yellow, Blue or Customized
5~15kN/Square Meter
Lifting Fork, Shifting Trolley
by Trolley or Crane
Available
China Slab Formwork for Concrete Construction
Slab Formwork
H20 Timber Beam Formwork
LIANGGONG
Steel Pallet or Customized
Customized
Jiangsu
8480600000
Product Description
 

Product Description

Table formwork

Table formwork is a kind of formwork that used for floor pouring , used widely in high-rise building , multi-level factory building , underground structure etc. During the construction, after the pouring completion, table formwork sets can be lifted by lifting fork to an upper level and reused, without need to dismantle. Compared with the traditional formwork, it is featured by its simple structure, easy disassembly, and being reusable. It has eliminated the traditional way of slab support system, which consists of cuplocks, eel pipes and timber planks. The construction speeds up obviously, and manpower has been saved greatly.

Products Show

Characteristics

Standard unit of table formwork

Table formwork standard unit has two sizes:2.44 × 4.88m and 3.3 × 5m .The structure diagram is as follows:

Assembly diagram of standard table formwork


For untypical floor casting, the non-standard table formwork can be designed according to the need. The combination of non-standard and standard table formwork can meet the needs of various shapes of floor pouring.


Edge and middle filler

Table formwork guardrail

The guardrail can be set at the edge of floor as needed, shown in the figure:

Lifting fork
The lifting fork for table formwork is used for lifting of the table formwork unit, which allows the overall transportation of the large-area table formwork, greatly improving the work efficiency and saving time. There are currently two main types of lifting fork s as shown:



Lifting fork operation chart

Project application


Shifting Trolley
The shifting trolley is used for the overall transportation of the formwork in the horizontal direction.

Trolley application diagram

Packing & Delivery

Packing Details :Package Box, Steel Pallet, Steel Frame, Container.
Delivery Details :Generally it is 5-30 days, it is according to quantity.
Port:  Shanghai or Qingdao

Our Service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
 

Company Profile

FAQ

Q1:Are you trading company or manufacturer?

A:We are factory.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.

Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
 A:Structural drawing and section drawing.

Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.

Q7:How long dose it take to manufacture the products after the signing of contract?
 A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$1650.00 100 Tons(MOQ)

Lianggong Smooth Surface Concrete with Tunnel Formwork for Large Accommodation Projects

YANCHENG LIANGGONG FORMWORK CO., LTD.
$1288.00 25 Pieces(MOQ)

Lianggong Formwork Manufacture Steel Manhole Trench Shields Aluminum Trench Shoring Box for Excavation Construction

YANCHENG LIANGGONG FORMWORK CO., LTD.
$75.00 100 Pieces(MOQ)

Slab Formwork Steel Frame Formwork T-Form with Early Stripping Device for Concrete Slab

YANCHENG LIANGGONG FORMWORK CO., LTD.
$1200.00 10 Tons(MOQ)

Lianggong Fast Pouring and Cost-Effective Drop Head Slab Formwork for High-Rise Buildings

YANCHENG LIANGGONG FORMWORK CO., LTD.
Negotiable 5000 Pieces(MOQ)

High Ribbed Formwork / High Rib Lath Steel Formwork for Construction

HEBEI GABION HARDWARE AND MESH CO., LTD.
$15.00 100 Pieces(MOQ)

Construction Shuttering Slab Formwork Scaffolding Adjustable Shoring Jack Acrow Prop

Cangzhou JDG Scaffolding Co., Ltd.
$100.00 100 Square Meters(MOQ)

Aluminum Formwork Wall Panel for Building

Abelly International Limited
$25.00 200 Pieces(MOQ)

Plastic Round Column Formwork for Concrete Slab

Cangzhou Guangsu E-COMMERCE Co., Ltd.
$1299.00 1 Ton(MOQ)

Construction Formwork Steel Templates for Building Bridge

Qingdao Hairun Intelligent Technology Co., Ltd.
$29.00 100 Pieces(MOQ)

PP Hollow Construction Formwork for Concrete

Shanxi Beizhu Radiator Trade Co., Ltd.