Building Material BS En39 Scaffold Steel Tube Gi Pipe Galvanized Pipe Galvanized Steel Pipe

Price $1.10 Compare
Min Order 1 kg
Availability In Stock
Shipping From Tianjin, China
Popularity 493 people viewed
Quantity
+-
 

Tianjin Huayou Scaffolding Co., Ltd.

VIP   Audited Supplier 5 years
Profile Certified by SGS/BV
  • Tianjin, China
  • Huayou (Mr.)  
    General Manager
HY-SP-007
Technic Support
3 Years
Steel
Fixed
Multi-Pole Scaffolding
Combined Scaffolding
Floor Type Scaffolding
Full Scaffolding
External Scaffolding
Attached Lifting Scaffolding
Scaffolding Frames
Building Scaffold
Hot DIP Galvanized/Pre-Galvanized/Painted
Q195/Q235/355
SGS
1 Piece
ERW
Building/Projects/Oil Gas/Construction
HUAYOU
Steel Strapped
33/38/42/48/60/72
China
7306309000
Product Description
FIRST. Company Profile

Tianjin Huayou Scaffolding Co., Ltd is a company specialized in producing and selling of scaffolding products and other related building materials and machines. Company located in Tianjin City, which is the largest manufacturing base of steel and scaffolding products. Furthermore, there is the largest sea port in China north area and easier to transport cargos all over the world.With years work, Huayou has made a complete product system and served materials to the different areas of the world like SouthEast Asia Market, MiddleEast Market; North & South America Market; Austrilia Market; Eroupe Market etc, we warmly welcome your inquiry.

SECOND. Scaffolding Tube Information Details

1.Scaffolding tube specification
Scaffolding Tube, Scaffolding Pipe, Steel Pipe, Steel Tube, BS, EN, ASTM, JIS standard, If you have requirements, we will try our best to support you.



 
ODWall ThicknessNormal Length MCustomized
21mm(1/2'')0.6mm--2.2mm0m--6mYes
26mm(3/4'')0.6mm--2.2mm0m--6mYes
33.4mm(1'')0.6mm--2.2mm0m--6mYes
34mm1.4mm--4.0mm0m--6mYes
38mm1.4mm--4.0mm0m--6mYes
42.2mm(1-1/4'')0.6mm--2.2mm0m--6mYes
42mm1.4mm--4.0mm0m--6mYes
48.3mm(1-1/2'')1.8mm-4.0mm0m--6mYes
48.6mm(1-1/2'')1.8mm--2.4mm0m--6mYes
60.3mm(2'')1.8mm-4.0mm0m--6mYes
88.9mm(3'')2.0mm-5.5mm0m--6mYes
114.3mm(4'')2.0mm--10.0mm6m--12mYes
141.3mm(5'')2.5mm--10.0mm6m--12mYes
165mm(6'')2.5mm--10.0mm6m--12mYes
219.1mm(8'')2.5mm--10.0mm6m--12mYes
 
2. Other Parameter
 
MaterialsQ195-Q355,A53-A369,#10--#45 steel
Tolerance+/-3%
Surface TreatmentOiled/Black/Painted/Galvanized
Processing ServiceBending/Punching/Cutting
Testing ReportSGS
PackageSteel Strap/anti-water roof
Engrave markingas your requirements
Production Capacity10000 tons/Month
Delivery time7-20 days

3. Inspection 
We have strict inspection procedure for steel pipe. Raw materials test, welding test, surface treatment test and packages management. For each batch, after inspection and mark them, then can load containers.


THIRD. Production Procedure

1. Raw materials Purchasing

a. Strict chemical componets and mechnical testing for pure steel grade

2.Production processing
b. Welding inspection
c. Cutting end clean
d. Surface treatment inspection and pack them.

3.Third party testing
SGS, CCIC

FORTH. FACTORY WORKSHOP AND LOADING

Our steel pipe factory have 3000 meters with 30 workers, although not large scale, we can give you high production capacity support.


FIFTH. CERTIFICATE
According to customers' requirements, we will arrange all our order materials to making SGS test. As a professional scaffolding steel pipe supplier, we guarantee all our products and give you more honest support. Quality is No.1 place forever. 

SIXTH. Other Service
We have more than 10 years scaffolding service expenrience for customers all over the world. Not only scaffolding products you can buy, we also can help you purchase others if you need. One-stop station purchasing service can make your work efficient.
Waiting for your warm inquiry and long term cooperation.


FAQ:

Q1: Where is the loading port?

A: Tianjin Xin port

Q2: What's the MOQ of the product?
A: Different item has different MOQ, can be negotiated.

Q3: What certificates do you have?
A: We have ISO 9001, SGS etc.

Q4: Can I get some samples?   
A: Yes, Sample is free, but shipping cost is on your side. 

Q5: How long is the production cycle after ordering?
A: Generally need around 20-30 days.

Q6: What is the payment methods?
A: T/T or 100% irrevocable LC at sight, can be negotiated.
  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$850.00 1 Ton(MOQ)

250*40mm and 250*50mm Scaffolding Steel Board Scaffold Steel Plank for Indonesia Market

Tianjin Huayou Scaffolding Co., Ltd.
$20.00 1000 Pieces(MOQ)

Galvanized Quick Erect Scaffold Cuplock Vertical Post Horizontal Ledger Cuplock Scaffolding on Sale

Tianjin Huayou Scaffolding Co., Ltd.
$1.50 1 kg(MOQ)

One Stop Factory Made Scaffold Building Material Walk Through Frame a Frame H Frame Scaffolding for Construction

Tianjin Huayou Scaffolding Co., Ltd.
$3200.00 1 piece(MOQ)

Scaffold Steel Pipe Straightening Machine with Rust Removal and Painting Function for Scaffolding Tube

Tianjin Huayou Scaffolding Co., Ltd.
$10.50 500 Pieces(MOQ)

Scaffolding Work Platform Metal Decking Steel Plank and Board/ Scaffolding Cat Walk

Rizhao Fast & Fasten Scaffold Co., Ltd.
$2.90 100 Pieces(MOQ)

Scaffolding Couplers Galvanized German Type 48.6mm by 60.3mm Forged Tube Connectors

Taizhou Nexus Import and Export Co., Ltd.
$24.80 100 Pieces(MOQ)

Wholesale Q235 Steel Walk Through H Frame Scaffolding Parts

Nanjing Uni-Tech Metalwork Co.,Ltd
Negotiable 1000 Pieces(MOQ)

Shoring Prop (RFH-D005)

Rizhao Fenghua Scaffoldings Co., Ltd.
$10.00 200 Pieces(MOQ)

Painted Light Duty Formwork Steel Prop Acrow Metal Struts Shoring Construction Building Material Support Jacks Construction Shoring Props Scaffolding

Sichuan Taishenglan Technology Co., Ltd
$0.35 10 Pieces(MOQ)

Scaffolding Parts Ringlock Scaffold Formwork Pressed Scaffold Lock Ledger End

Cangzhou JDG Scaffolding Co., Ltd.