
Lianggong Formwork Manufacture Competitive Price Manufacturer Steel Frame Formwork for Modular Column Slab Wall Formwork
Steel Frame Formwork

1. | Easy to connect. |
2. | Adjustable panel. |
3. | Large-area shuttering. |
4. | Easy and fast operations. |
5. | Adjustable alignment coupler. |
6. | Complete piece birch plywood and replaceable. |



1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1 | Production: For full container, normally we need 20-30 days after receive customer's down payment. |
2 | Transportation: It depends on the destination charge port. |
3 | Negotiation is needed for special requirements. |


1.Consulting,Design,and Quotation
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
4.Remote or On-site instruction

Q: How long is your delivery time?
Q: Do you provide samples ? Is it free or extra ?
Q: What is your terms of payment ?
Any question, please feel free to contact us !