Tianjin Huayou Scaffolding Co., Ltd is a company specialized in producing and selling of scaffolding products and other related building materials. Company located in Tianjin City, which is the largest manufacturing base of steel and scaffolding products. Furthermore, there is the largest sea port in China north area and easier to transport cargos all over the world.With years work, Huayou has made a complete product system and served materials to the different areas of the world like SouthEast Asia Market, MiddleEast Market; North & South America Market; Austrilia Market; Eroupe Market etc, we warmly welcome your inquiry.
PRODUCT INTRODUCTION:
Scaffolding Metal Plank is an important component to provide support for construction work. It helps workers to walk through and work on the different scaffolding system. With its various design and size, Huayou Scaffolding Metal Plank has became the nesseccory components to scaffolding systems and widely used by different market clients. Warmly welcome your inquiry.
Detailed Size:
WIDTH (MM) | HEIGHT (MM) | TKN (MM) | LENGTH (MM) | STIFFENNER TYPE |
200 | 50 | 1.0-2.0 | 500-4000 | FLATE/BOX/LADDER |
210 | 45 | 1.0-2.0 | 500-4000 | FLATE/BOX/LADDER |
225 | 38 | 1.0-2.0 | 500-4000 | FLATE/BOX/LADDER |
230 | 63.5 | 1.0-2.0 | 500-4000 | FLATE |
240 | 45/50 | 1.0-2.0 | 500-4000 | FLATE/BOX/LADDER |
250 | 40/50 | 1.0-2.0 | 500-4000 | FLATE/BOX/LADDER |
300 | 50 | 1.0-2.0 | 500-4000 | FLATE/BOX |
318 | 50 | 1.0-2.0 | 500-4000 | FLATE/BOX |
320 | 76 | 1.0-2.0 | 730-3070 | FLATE |
Welding & Stiffener

American and European Type Showing:

Stanard: BS EN 12811-1 / AS 1577 - 1993
Finishing: Pre Galvanized / Painted / Hot Dipped Galvanized
Material: Q235, Q355
Finishing: Pre Galvanized / Painted / Hot Dipped Galvanized
Material: Q235, Q355


we can say, Only if you have different requirements, please find us, we can give you more support, even have drawings details, we also can.
PRODUCTION PROCESS:



PACKAGE & LOADING:
-By pieces or by bundle or by pallet, as requested.
Steel Strapped by steel coil.
This packages are so easy for your unloading by liftfork. But For each container, the loading quantity is large, thus your freight cost will increase a little than loading by loose.
80 pcs/bundle, 100pcs/bundle


This loading can give you more quantity for one container loading, nd fully use space thus can reduce some freight cost.
But you have to unload them one by one. Need too much staff working.
This packages just use for American or European customers. This packages not only have higher cost, but also loading very less. But it is very convenient way to loading and unloading and make storage. Even better for your transportation by truch.

FACTORY:


CERTIFICATE:

OTHER RELATED PRODUCTS:

FAQ:
Q1: Where is the loading port?
A: Tianjin Xin port
Q2: What's the MOQ of the product?
A: Different item has different MOQ, can be negotiated.
Q3: What certificates do you have?
A: We have ISO 9001, SGS etc.
Q4: Can I get some samples?
A: Yes, Sample is free, but shipping cost is on your side.
Q5: How long is the production cycle after ordering?
A: Generally need around 20-30 days.
Q6: What is the payment methods?
A: T/T or 100% irrevocable LC at sight, can be negotiated.