Chinese Factory Supply Solid Control System Drilling Fluids Mud Gas Liquid Separator

Price $31000.00 Compare
Min Order 1 Piece
Availability In Stock
Shipping From Shaanxi, China
Popularity 404 people viewed
Quantity
+-
 

Shaanxi Xixian New Area Zhongcheng Machinery Manufacturing Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
ZCNQF-800/1.5
24/7
1 Year
ISO 9001:2000, ISO 9001:2008
Electric
Alloy
Liquid Gas Separator
180-320
0.8-2.5
800-1200
125-200
zhongcheng
Pallet or Wooden Case
China
Product Description
Chinese Factory Supply Solid Control System Drilling Fluids Mud Gas Liquid Separator 


Product Description

 
Mud/Gas Separator is a piece of special equipment for degassing gas-invaded mud in the first grade. It is mainly used to remove big bubbles above φ3mm in diameter and these bubbles refer to expanded gases in the fluids that fill in some parts of well annulus. Well kick even spilling out to the rotary table will easily occur if they are not removed.

Spec
 
ModelZCNQF-800/1.5ZCNQF-1000/2.5ZCNQF-1200/2.5
Capacity180m3/h240m3/h320m3/h
Main body Diameter800mm1000mm1200mm
Working pressure: Mpa0.8/1.51.5/2.52.5
Main body Diameter800mm1000mm1200mm
Inlet Pipe :mmDN100DN125DN150
Output Pipe:mmDN125DN200DN250
Gas Discharge pipeDN125DN200DN200
Weight:KG180022002500
Dimensions1800x1800x53502000x2000x58602200x2200x6634

Detailed Pic
 




 
Why choose us ? 

Q1. Are you a manufacturer?

Yes, we have manufactured oilfield equipment for over 20 years. We can produce product according the spec customer provided . 

Q2. Do your equipment come with a warranty?

Yes, we have one year warranty. and we provide very patient after service job .

Q3. Can we customize the equipment from you?

Yes,  actually 60% of our products are customized for our clients. You just need to let us know your demand (specifications &drawing is better), and we shall realize them for you.

Q4. How do you deliver your equipment?

By sea usually 

Q5. What's the lead time for the equipment and its spare parts?  

Generally 20 days for manufacturing of complete set of equipment. Depending on the quantity, the lead time for spare parts is between 15 days.




If you interested , Welcome to inquire us . Looking Forward with your cooperation  .





  • Contact Supplier
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA  
$5000.00 1 Piece(MOQ)

Oilfield Solid Control Drilling Fluid Mud Tank Stirrer Propeller Mixer Agitator

Shaanxi Xixian New Area Zhongcheng Machinery Manufacturing Co., Ltd.
$5000.00 1 Piece(MOQ)

Petroleum Equipment Oilfield Drilling Mud Centrifugal Wear Resistant Pump Slurry Sand Pump

Shaanxi Xixian New Area Zhongcheng Machinery Manufacturing Co., Ltd.
$5000.00 1 Piece(MOQ)

Factory Supply Oil Drilling Mud Solid Control Equipment Electronic Flare Ignition Device

Shaanxi Xixian New Area Zhongcheng Machinery Manufacturing Co., Ltd.
$8000.00 1 Piece(MOQ)

Transport Fuel Tanker Oil Storage Tank

Shaanxi Xixian New Area Zhongcheng Machinery Manufacturing Co., Ltd.
$8000.00 1 Piece(MOQ)

Drilling Solid Control System Cyclone Filter Mud Treatment Slurry Cleaner

Shaanxi Xixian New Area Zhongcheng Machinery Manufacturing Co., Ltd.
$8000.00 1 Piece(MOQ)

Vacuum Degasifier Unit for Solid Control System

Xi'an Hondin Energy Technology Co., Ltd.
$10000.00 1 set(MOQ)

Gardner Denver Triplex Mud Pump Pah-275, Pz-7, Pz-8, Pz-9, Pz-11, Pz-11-7500psi Pump/Piston Pump/Slurry Pump/Water Pump/Gd Drilling Pump API Standard

UPET GROUP CO., LTD.
$13000.00 1 Set(MOQ)

160L/Min Electric Mud Grout Pump with Mixer for Backfilling

Zhengzhou dafeng Machinery Co., Ltd.
$15000.00 1 Piece(MOQ)

High-Performance Mud Dewatering Unit for Maximizing Dewatering Efficiency and Minimizing Environmental Impact

KES Separation Machinery Tianjin Co. Ltd
$5000.00 1 Piece(MOQ)

High Abrasion Resistance Continuous Operation Submersible Slurry Pump for Sludge and Slurry Transfer

KES Separation Machinery Tianjin Co. Ltd